a) Standardization of methods, procedures, instruments and equipment relating to techniques for hydrometric determination of water level, velocity, discharge and sediment transport in open channels and fluid flow in closed conduits, hydrological and meterological investigations.
b) Co- ordination with the work of:
i)ISO/TC 113 hydrometry and its subcommittees SC 1 and SC 6- Secretariat
ii)ISO/TC 113/SC 1, SC 2, SC 5 & SC 6 -P member
iii) ISO/TC 30 measurement of fluid flow in closed conduits and its subcommittees SC 2, SC 5 and SC 7 - O member, SO TC-319 (O): Karst
ISO TC-30 (O): Measurement of fluid flow in closed conduits ; ISO TC-30 SC-2 (O): Pressure differential devices ; ISO TC-30 SC-5 (O): Velocity and mass methods ; ISO TC-30 SC-7 (O): Volume methods including water meters ; ISO TC-113 (P): Hydrometry ; ISO TC-113 SC-1 (P): Velocity area methods ; ISO TC-113 SC-2 (P): Flow measurement structures ; ISO TC-113 SC-5 (P): Instruments, equipment and data management ; ISO TC-113 SC-6 (P): Sediment transport ; ISO TC-113 SC-8 (P): Ground water ;
a) Standardization of all aspects of ground water resources, related investigations, water harvesting and recharge for ground water
b)Co- ordination with work of ISO/TC 113 / SC 8
ISO TC-113 SC-8 (P): Ground water ; ISO TC-319 (O): Karst ;
3
WRD 5
Geological Investigation and Subsurface Exploration
Standardization of criteria for choice of methods, investigations and testing of subsurface strata and recommendations for collection and presentation of data.
No details found.
4
WRD 6
Water Resources Planning, Management and Evaluation
Standardization of criteria for design and construction of foundations on rocks, impermeable and permeable strata for water resource projects, including methods of foundation treatment.
Standardization of criteria for planning, location, design, construction, inspection, maintenance and other related aspects for canals and cross drainage works.
Standardization of criteria for selection, installation, usage and maintenance of instruments used for the measurement of displacement, strain, stress, temperature etc. in hydraulic structures.
No details found.
13
WRD 21
Safety In Construction, Operation And Maintenance Of River Valley Projects
Standardization of safety aspects during various stages of construction, operation and maintenance of components and appurtenances of water resource projects.
No details found.
14
WRD 22
Flood Management, Erosion Management and Diversion Works
Standardization of criteria for planning, design, construction, operation, maintenance and other related aspects of river training works, barrages, weirs and diversion works.
No details found.
15
WRD 23
Measurement and Cost Analysis of Works for River Valley Projects