Know Your Standard Standards under Mandatory Certification Group Wise Classification Ministry/Department Wise Classification
( Sub Sub Group : Planning, Design, Construction and Safety of Diversion works, Barrages and related structures )
Total Standards : 24
Revised Standards
New Standards
S.No | IS Number | IS Title | Amendment | Reaffirmation Year | Document | Action |
---|---|---|---|---|---|---|
1 | IS 10084 : Part 1 : 1982 |
Criteria for design of diversion works: Part 1 coffer dams | 0 | Mar, 2021 | Download | |
2 | IS 10084 : Part 2 : 2014 |
Design of diversion works - Criteria: Part 2 diversion channel and open cut or conduit in the body of dam (First Revision) | 0 | Dec, 2023 | Download | |
3 | IS 10788 : Part 1 : 1984 |
Code of practice for construction of diversion works: Part 1 cellular coffer dams | 0 | Mar, 2021 | Download | |
4 | IS 11130 : 1984 |
Criteria for structural design of barrages and whrs | 1 | Mar, 2021 | Download | |
5 | IS 11150 : 1993 (1 Revision) |
Construction of concrete barrages - Code of practice (First Revision) | 1 | Mar, 2021 | Download | |
6 | IS 11532 : 1995 (1 Revision) |
Construction and maintenance of river embankments (Levees) - Guidelines (First Revision) | 1 | Mar, 2021 | Download | |
7 | IS 12094 : 2018 (2 Revision) |
Planning and design of river embankments (Levees) - Guidelines (Second Revision) | 0 | Mar, 2023 | Download | |
8 | IS 12892 : 1989 |
Safety of barrage and weir structures - Guidelines | 1 | Mar, 2021 | Download | |
9 | IS 12926 : 1995 (1 Revision) |
Construction and maintenance of guide banks in alluvial rivers - Guidelines (First Revision) | 0 | Mar, 2021 | Download | |
10 | IS 13877 : 1993 |
Planning and design of fish pass - Guidelines | 0 | Mar, 2021 | Download | |
11 | IS 13912 : 1993 |
Closure of diversion channel and open cut or conduit inthe body of the dam - Code of practice | 1 | Dec, 2023 | Download | |
12 | IS 14262 : 1995 |
Planning and design of revetment - Guidelines | 0 | Mar, 2021 | Download | |
13 | IS 14592 : Part 1 : 1998 |
Planningand design ofbarrage powerhouses - Guidelines: Part 1 investigation, planning and layout | 0 | Dec, 2023 | Download | |
14 | IS 14815 : 2000 |
Design flood for river diversion works - Guidelines | 0 | Mar, 2021 | Download | |
15 | IS 14955 : 2001 |
Guidelines for hydraulic model studies of barrages and weirs | 0 | Mar, 2021 | Download | |
16 | IS 4410 : Part 3 : 1988 (1 Revision) |
Glossary of terms relating to river valley projects: Part 3 river and river training (First Revision) | 0 | Mar, 2021 | Download | |
17 | IS 4410 : Part 12 : 1993 (1 Revision) |
Glossary of terms relating to river valley projects: Part 12 diversion works (First Revision) | 0 | Mar, 2021 | Download | |
18 | IS 4410 : Part 22 : 1994 |
Gloss4ry of terms relating to river valley projects: Part 22 barrages and weirs | 0 | Mar, 2021 | Download | |
19 | IS 6966 : Part 1 : 1989 (1 Revision) |
Hydraulic design of barrages and weirs - Guidelines: Part 1 alluvial reaches (First Revision) | 1 | Mar, 2021 | Download | |
20 | IS 7349 : 2012 (2 Revision) |
Barrages and weirs - Operation and maintenance - Guidelines (Second Revision) | 0 | Mar, 2021 | Download | |
21 | IS 7720 : 1991 (1 Revision) |
Criteria for investigation, planning and layout for barrages and weirs (First Revision) | 0 | Mar, 2021 | Download | |
22 | IS 8408 : 1994 (1 Revision) |
Planning and design of groynes in alluvial river - Guidelines (First Revision) | 0 | Mar, 2021 | Download | |
23 | IS 9461 : 1980 |
Guidelines for data required for design of temporary river diversion worrs | 1 | Mar, 2021 | Download | |
24 | IS 9795 : Part 1 : 1981 |
Guidelines for the choice of the type of diversion works: Part 1 coffer dams | 1 | Mar, 2021 | Download |