MED 21-Diamond Core And Waterwell Drilling  Standards List


Aspect : Publication Date :


Total Standards :  36

Revised Standards    New Standards
S.No IS Number IS Title Amendment Reaffirmation Year Document Action
1 IS 10208 : 1982
Reviewed In : 2022

Specification for diamond core drilling equipment 2 Jan, 2022 Download
2 IS 11189 : 2020


(First Revision)
Methods of Tubewell Development ( First Revision ) 0 ---- Download
3 IS 11312 (Part 1) : 1985
Reviewed In : 2022

Specification for external upset drill pipe assemblies for use in water well drilling: Part 1 screwed on joints drill pipe 1 Jan, 2022 Download
4 IS 11632 : 2020


(First Revision)
Code of Practice of Rehabilitation of Tubewells ( First Revision ) 0 ---- Download
5 IS 11672 : 1986
Reviewed In : 2022

Specification for tungsten carbide buttons and inserts for use in down - The - Hole (DTH) bits 0 Jan, 2022 Download
6 IS 11710 (Part 1) : 2005
Reviewed In : 2020

(First Revision)
Selection and design of diamond core drills - Code of practice: Part 1 mechanical drive (First Revision) 0 Aug, 2020 Download
7 IS 11710 (Part 1) : 2024


(Second Revision)
Selection of Diamond Core Drills � Code of Practice Part 1 Mechanical Drive 0 ---- Buy
8 IS 11710 (Part 2) : 2005
Reviewed In : 2020

(First Revision)
Selection and design of diamond core drills - Code of practice: Part 2 top drive hydraulic (First Revision) 0 Aug, 2020 Download
9 IS 11710 (Part 2) : 2024


(Second Revision)
Selection of Diamond Core Drills � Code of Practice Part 2 Top Drive Hydraulic 0 ---- Buy
10 IS 11830 (Part 1) : 2024


(Second Revision)
Water well drilling Specification Part 1 General requirements for hydraulic rigs (Down-the-hole hammer or mud rotary drilling) (SECOND REVISION) 0 ---- Buy
11 IS 11830 (Part 1) : 1991
Reviewed In : 2022

(First Revision)
Waterwell drilling - Down - The - Hole hammer rigs: Part 1 general requirements for hydraulic rigs (With Or Without Rotary Mode) (First Revision) 0 Jan, 2022 Download
12 IS 11830 (Part 2) : 1989
Reviewed In : 2019

Water - Well drilling - Down - The - Hole hammer rigs: Part 2 general requirements for pneumatic rigs 0 Sep, 2019 Download
13 IS 12214 : 1987
Reviewed In : 2022

General requirements for rotary hose for water - Well drilling equipment 0 Jan, 2022 Download
14 IS 12629 : 1989
Reviewed In : 2019

Water well drilling - Rotary hose for rotary drilling - Recommended practice for care and use 0 Sep, 2019 Download
15 IS 12635 : 2000
Reviewed In : 2020

(First Revision)
Water well drilling and blast hole drilling - Rock roller bit with non - Sealed ball and roller bearing arrangement - Technical supply conditions (First Revision) 0 Aug, 2020 Download
16 IS 12682 : 1989
Reviewed In : 2019

Water well drilling - Percussion drilling rigs - General requirements 0 Sep, 2019 Download
17 IS 12682 : 2024


(First Revision)
WATER WELL DRILLING - PERCUSSION DRILLING RIGS - GENERAL REQUIREMENTS (FIRST REVISION) 0 ---- Buy
18 IS 15028 : 2001
Reviewed In : 2022

Hoisting swivel for use with diamond core drilling - Requirements 1 Jan, 2022 Download
19 IS 15028 : 2024


(First Revision)
Hoisting Swivel for Use with Diamond Core Drilling � Specification (First revision) 0 ---- Buy
20 IS 15029 : 2024


(First Revision)
Recovery taps for use with diamond core drilling - Specification (FIRST REVISION) 0 ---- Buy
21 IS 15083 : 2001
Reviewed In : 2022

Water swivel for use with diamond core drilling - Requirements 0 Jan, 2022 Download
22 IS 15145 : 2002
Reviewed In : 2019

Round kelly for direct rotary water well drilling rig - Requirements 0 May, 2019 Download
23 IS 15481 (Part 1) : 2004
ISO 10097-1:1999
Reviewed In : 2021
ISO 10097-1:1999
Wireline diamond core drilling equipment - System A: Part 1 metric units 0 Mar, 2021 Buy
24 IS/ISO 18758-1 : 2018


Mining and earth-moving machinery Rock drill rigs and rock reinforcement rigs Part 1: Vocabulary Adoption of ISO 18758 0 ---- Download
25 IS/ISO 18758-2 : 2018

ISO 30414
Mining and earth-moving machinery Rock drill rigs and rock reinforcement rigs Part 2: Safety requirements Adoption of ISO 18758-2:2018 0 ---- Buy
26 IS 2800 : 2019
Reviewed In : 2024

Code of practice for construction and testing of tubewells 0 Mar, 2024 Download
27 IS 4097 : 2019
Reviewed In : 2024

(First Revision)
Specification for material (Gravel) for use as filter pack in tubewells (First Revision) 0 Mar, 2024 Download
28 IS 7156 : 1974
Reviewed In : 2022

General requirements for reverse circulation drilling rigs 1 Jan, 2022 Download
29 IS 7156 : 2024


(First Revision)
Reverse Circulation Drilling Rigs — General Requirements (First Revision) 0 ---- Buy
30 IS 7206 : 1986
Reviewed In : 2022

(First Revision)
General requirements for direct circulation rotary drilling rigs: Part 1 with rotary table (First Revision) 1 Jan, 2022 Download
31 IS 7206 : 2024


(Second Revision)
Drilling Rigs With Rotary Table Specification 0 ---- Buy
32 IS 7209 : 1974
Reviewed In : 2022

General requirements for blast hole drilling rigs 0 Jan, 2022 Download
33 IS 8110 : 2019
Reviewed In : 2024

(Third Revision)
Water well screens and slotted pipes - Specification (Third Revision) 1 Mar, 2024 Download
34 IS 8986 : 2022
ISO 15216-2 : 2019

ISO 15216-2 : 2019
(Second Revision)
Hexagonal Integral Drill Steel and Extension Rods and Hollow Round Drill Steel in Bar Form Dimensions Second revision 0 ---- Buy
35 IS 9026 : 2004
Reviewed In : 2020

(First Revision)
Rope threaded percussive long - Hole drilling equipments - Specification (First Revision) 0 Aug, 2020 Download
36 IS 9439 : 2022


(Second Revision)
Glossary of Terms Used in Water-well Drilling Technology 0 ---- Buy