Home
About the Activity
Standard of the Week
Standard of the Month
BIS Talks
Know Your Standard
Contact Us
Login
WC-draft/WRD
Home
Details
Show
10
25
50
100
entries
Search:
S No
Document No.
Document title
Last date of comment
Detail
ICS No.
Draft
1.
WRD 14(27793)
CRITERIA FOR STRUCTURAL DESIGN OF PENSTOCK GUIDELINES PART 3 SPECIALS FOR PENSTOCKS First Revision of IS 11639 Part 3
N/A
Detail
93.160
Download
2.
WRD 14(27641)
HYDRAULIC DESIGN OF PUMP SUMPS AND INTAKES GUIDELINES First Revision of IS 15310
23-05-2025
Detail
93.160
Download
3.
WRD 16(27508)
INSTALLATION AND OBSERVATION OF INSTRUMENTS FOR TEMPERATURE MEASUREMENTS INSIDE DAMS - CODE OF PRACTICE: RESISTANCE TYPE THERMOMETERS
07-04-2025
Detail
93.160
Download
4.
WRD 10(27501)
OPERATION OF RESERVOIRS GUIDELINES Second Revision of IS 7323
12-04-2025
Detail
93.160
Download
5.
WRD 14(27494)
FIRST FILLING AND EMPTYING OF PRESSURE TUNNELS GUIDELINES First Revision of IS 12633
01-04-2025
Detail
93.060
Download
6.
WRD 14(27491)
CONSTRUCTION OF TUNNELS CONVEYING WATER PART 1 PRECISION SURVEY AND SETTING OUT CODE OF PRACTICE First Revision of IS 5878 Part 1
01-04-2025
Detail
93.060
Download
7.
WRD 23(27479)
METHODS OF MEASUREMENT OF WORK IN RIVER VALLEY PROJECTS DAMS AND APPURTENANT STRUCTURES PART 12 TOPOGRAPHICAL SURVEYS
04-04-2025
Detail
93.160
Download
8.
WRD 23(27478)
METHODS OF MEASUREMENT OF WORK IN RIVER VALLEY PROJECTS DAMS AND APPURTENANT STRUCTURES PART 11 DIAPHRAGM WALLS
04-04-2025
Detail
93.160
Download
9.
WRD 23(27477)
METHOD OF MEASUREMENT OF WORKS IN RIVER VALLEY PROJECTS DAMS AND APPURTENANT STRUCTURES PART 10 FORMWORK
01-04-2025
Detail
93.160
Download
10.
WRD 23(27474)
METHOD OF MEASUREMENT OF WORKS IN RIVER VALLEY PROJECTS DAMS AND APPURTENANT STRUCTURES PART 9 LINING
01-04-2025
Detail
93.160
Download
Showing 1 to 10 of 28 entries
Previous
1
2
3
Next