1. |
WRD 10(27501) |
OPERATION OF RESERVOIRS GUIDELINES Second Revision of IS 7323 |
N/A |
|
93.160 |
|
2. |
WRD 14(27494) |
FIRST FILLING AND EMPTYING OF PRESSURE TUNNELS GUIDELINES First Revision of IS 12633 |
01-04-2025 |
|
93.060 | |
3. |
WRD 14(27491) |
CONSTRUCTION OF TUNNELS CONVEYING WATER PART 1 PRECISION SURVEY AND SETTING OUT CODE OF PRACTICE First Revision of IS 5878 Part 1 |
01-04-2025 |
|
93.060 | |
4. |
WRD 23(27479) |
METHODS OF MEASUREMENT OF WORK IN RIVER VALLEY PROJECTS DAMS AND APPURTENANT STRUCTURES PART 12 TOPOGRAPHICAL SURVEYS |
04-04-2025 |
|
93.160 | |
5. |
WRD 23(27478) |
METHODS OF MEASUREMENT OF WORK IN RIVER VALLEY PROJECTS DAMS AND APPURTENANT STRUCTURES PART 11 DIAPHRAGM WALLS |
04-04-2025 |
|
93.160 | |
6. |
WRD 23(27477) |
METHOD OF MEASUREMENT OF WORKS IN RIVER VALLEY PROJECTS DAMS AND APPURTENANT STRUCTURES PART 10 FORMWORK |
01-04-2025 |
|
93.160 | |
7. |
WRD 23(27474) |
METHOD OF MEASUREMENT OF WORKS IN RIVER VALLEY PROJECTS DAMS AND APPURTENANT STRUCTURES PART 9 LINING |
01-04-2025 |
|
93.160 | |
8. |
WRD 23(27473) |
METHOD OF MEASUREMENT OF WORKS IN RIVER VALLEY PROJECTS DAMS AND APPURTENANT STRUCTURES PART 1 EXCAVATION FOR FOUNDATION |
04-04-2025 |
|
93.160 | |
9. |
WRD 8(27328) |
GLOSSARY OF TERMS RELATING TO RIVER VALLEY PROJECTS PART 19 GROUTING |
16-03-2025 |
|
93.160 | |
10. |
WRD 9(26616) |
Hydraulic Design of Spillway Aerators — Guidelines |
06-12-2024 |
|
93.160 | |
11. |
WRD 9(26589) |
Criteria for Design of Hydraulic Jump Type Stilling Basins with Horizontal and Sloping Apron |
18-11-2024 |
|
93.160 | |
12. |
WRD 12(26022) |
RECOMMENDATIONS FOR STRUCTURAL DESIGN OF FIXED-WHEEL GATES |
20-01-2025 |
|
ICS 93.160 | |
13. |
WRD 12(26021) |
RECOMMENDATIONS FOR STRUCTURAL DESIGN OF MEDIUM AND HIGH HEAD SLIDE GATES |
09-11-2024 |
|
93.160 | |
14. |
WRD 12(25932) |
DESIGN AND USE OF RUBBER SEALS FOR HYDRAULIC GATES - RECOMMENDATIONS |
08-11-2024 |
|
ICS 93.160 | |
15. |
WRD 12(25926) |
RECOMMENDATIONS FOR STRUCTURAL DESIGN OF RADIAL GATES |
23-08-2024 |
|
ICS 93.160 | |
16. |
WRD 24(25811) |
Preparation of Catchment Area Treatment (CAT) Plan — Guidelines |
12-08-2024 |
|
13.020.30 | |
17. |
WRD 28(24783) |
GLOSSARY OF TERMS RELATED TO COASTAL ENGINEERING |
09-12-2024 |
|
93.010 | |
18. |
WRD 6(24196) |
PROFORMA FOR REPORTING PROGRESS DURING CONSTRUCTION FOR RIVER VALLEY PROJECTS PART 1 IRRIGATION WORKS First Revision of IS 13218 Part 1 |
27-09-2024 |
|
93.160 | |
19. |
WRD 24(23493) |
Use of Remote Sensing and Geographical Information System in Environmental Impact Assessment and Environment Management Plan — Recommendations |
04-08-2024 |
|
13.020.30 | |
20. |
WRD 24(23492) |
Parameters and Assessment Criteria for Downstream Flow to Maintain Ecological Balance — Guidelines |
03-09-2024 |
|
13.020.30 | |
21. |
WRD 22(22125) |
CONSTRUCTION AND MAINTENANCE OF RIVER EMBANKMENTS LEVEES GUIDELINES Second Revision of IS 11532 |
16-05-2023 |
|
93.140 | |
22. |
WRD 22(22124) |
SAFETY OF BARRAGE AND WEIR STRUCTURES — GUIDELINES (First Revision of IS 12892) |
16-05-2023 |
|
93.160 | |
23. |
WRD 22(22122) |
PLANNING AND DESIGN OF REVETMENT – GUIDELINES (First Revision of IS 14262) |
16-05-2023 |
|
93.160 | |
24. |
WRD 15(21609) |
GUIDELINES FOR PLANNING LAYOUT AND DESIGN OF CAVITIES IN UNDERGROUND HYDROELECTRIC POWER STATIONS |
03-03-2023 |
|
93.160 | |
25. |
WRD 5(21364) |
SYMBOLS AND ABBREVATIONS FOR USE IN GEOLOGICAL MAPS SECTIONS AND SUBSURFACE EXPLORATORY LOGS PART 1 ABBREVATIONS |
04-02-2023 |
|