S. No. |
Doc. NO. | Document Title | Stage |
---|---|---|---|
1 | WRD/01/19429 | METHOD OF FLOW ESTIMATION BY JET CHARACTERISTICS APPROXIMATE METHODS | Finalization |
2 | WRD/01/20086 | HYDROMETRY MEASUREMENT OF LIQUID FLOW IN OPEN CHANNELS USING CURRENT-METERS OR FLOATS | Under Published |
3 | WRD/01/20332 | HHydrometry - Calibration of current - Meters in straight open tanks | WC-Draft |
4 | WRD/01/20347 | Measurement of Fluid Flow in Closed Conduits Velocity Area Method Using Pitot Static Tube | WC-Draft |
5 | WRD/01/20496 | HYDROMETRY VOCABULARY AND SYMBOLS | WC-Draft |
6 | WRD/01/20512 | HYDROMETRY FUNCTIONAL REQUIREMENTS AND CHARACTERISTICS OF SUSPENDED- SEDIMENT SAMPLERS | WC-Draft |
7 | WRD/01/21458 | HYDROMETRIC DETERMINATIONS FLOW MEASUREMENTS IN OPEN CHANNELS USING STRUCTURES GUIDELINES FOR SELECTION OF STRUCTURE | WC-Draft |
8 | WRD/01/22021 | VERTICAL STAFF GAUGES-FUNCTIONAL REQUIREMENTS | WC-Draft |
9 | WRD/01/22063 | Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted In Circular Cross Section Conduits Running Full Part 1 : General Principles And Requirements | WC-Draft |
10 | WRD/01/22064 | Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted In Circular Cross Section Conduits Running Full Part 4 Venturi Tubes | WC-Draft |
11 | WRD/01/22080 | Measurement of fluid flow by means of pressure differential devices inserted in circular cross -: Sec conduits running full: Part 2 orifice plates | WC-Draft |
12 | WRD/01/23721 | FLOW MEASUREMENT STRUCTURES RECTANGULAR TRAPEZOIDAL AND U-SHAPED FLUMES | WC-Draft |
13 | WRD/01/23843 | Methods for Measurement of Suspended Sediment in Open Channels | WC-Draft |
14 | WRD/01/23881 | HYDROMETRY ACOUSTIC DOPPLER PROFILER METHOD AND APPLICATION FOR MEASUREMENT OF FLOW IN OPEN CHANNELS | WC-Draft |
15 | WRD/03/16962 | Pumping Test of Water Wells - Code of Practice (First Revision) | Under Published |
16 | WRD/03/17098 | Guidelines for Aquifer Mapping | WC-Draft |
17 | WRD/03/21368 | GLOSSARY OF TERMS RELATING TO RIVER VALLEY PROJECTS PART 11 HYDROLOGY Section 1 General Terms ( First Revision ) | Under Published |
18 | WRD/03/21909 | HYDROMETRY GEOPHYSICAL LOGGING OF BOREHOLES FOR HYDROGEOLOGICAL PURPOSES CONSIDERATIONS AND GUIDELINES FOR MAKING MEASUREMENTS | WC-Draft |
19 | WRD/03/25504 | IMPACT ASSESSMENT TECHNIQUES FOR ARTIFICIAL RECHARGE STRUCTURES | P-Draft |
20 | WRD/05/19981 | Presentation of Drilling Information and Core Description in Geotechnical Investigation — Code of Practice | Under Published |
21 | WRD/05/19982 | GEOLOGICAL EXPLORATION FOR RESERVOIR SITES GUIDELINES (FIRST REVISION) | WC-Draft |
22 | WRD/05/21364 | SYMBOLS AND ABBREVATIONS FOR USE IN GEOLOGICAL MAPS SECTIONS AND SUBSURFACE EXPLORATORY LOGS PART 1 ABBREVATIONS | WC-Draft |
23 | WRD/05/21365 | SYMBOLS AND ABBREVATIONS FOR USE IN GEOLOGICAL MAPS SECTIONS AND SUBSURFACE EXPLORATORY LOGS PART 2 IGNEOUS ROCKS (First Revision) | Under Published |
24 | WRD/05/21366 | SYMBOLS AND ABBREVIATIONS FOR USE IN GEOLOGICAL MAPS, SECTIONS AND SUBSURFACE EXPLORATORY LOGS PART 3 Sedimentary Rocks (First Revision) | Under Published |
25 | WRD/05/21369 | SYMBOLS AND ABBREVATIONS FOR USE IN GEOLOGICAL MAPS SECTIONS AND SUBSURFACE EXPLORATORY LOGS PART 4 METAMORPHIC ROCKS (First Revision) | Under Published |
26 | WRD/05/21370 | SYMBOLS AND ABBREVATIONS FOR USE IN GEOLOGICAL MAPS SECTIONS AND SUBSURFACE EXPLORATORY LOGS PART 5 LINE SYMBOLS FOR FORMATION CONTACTS AND STRUCTURAL FEATURES (First Revision) | Under Published |
27 | WRD/05/21415 | GEOLOGICAL EXPLORATION BY GEOPHYSICALMETHOD SEISMIC REFRACTION CODE OF PRACTICE First Revision of IS 15681 | P-Draft |
28 | WRD/05/21422 | GEOLOGICAL EXPLORATION BY GEOPHYSICAL METHOD ELECTRICAL RESISTIVITY METHOD CODE OF PRACTICE First Revision of IS 15736 | P-Draft |
29 | WRD/06/22370 | FIXING RATES FOR IRRIGATION WATER GUIDELINES | P-Draft |
30 | WRD/06/22547 | PROFORMA FOR REPORTING PROGRESS DURING CONSTRUCTION FOR RIVER VALLEY PROJECTS PART 3 FLOOD CONTROL First Revision of IS 13218 Part 3 | WC-Draft |
31 | WRD/06/22645 | RECOMMENDATIONS FOR WATERSHED MANAGEMENT RELATING TO SOIL CONSERVATION PART 1 AGRONOMIC ASPECTS First Revision of IS 6748 Part 1 | WC-Draft |
32 | WRD/06/24196 | PROFORMA FOR REPORTING PROGRESS DURING CONSTRUCTION FOR RIVER VALLEY PROJECTS PART 1 IRRIGATION WORKS First Revision of IS 13218 Part 1 | P-Draft |
33 | WRD/08/21401 | GLOSSARY OF TERMS RELATING TO RIVER VALLERY PROJECTS PART 19 GROUTING | WC-Draft |
34 | WRD/09/15557 | HYDRAULIC DESIGN OF SPILLWAY AERATORS — GUIDELINES | Finalization |
35 | WRD/09/15646 | CRITERIA FOR DESIGN OF HYDRAULIC JUMP TYPE STILLING BASINS WITH HORIZONTAL AND SLOPING APRON (First Revision of IS 4997) | Under Published |
36 | WRD/09/15743 | PLANNING AND STRUCTURAL DESIGN OF CONCRETE FACE ROCKFILL DAM - GUIDELINES | Under Published |
37 | WRD/09/19599 | GALLERIES AND OTHER OPENINGS IN DAMS - CODE OF PRACTICE : PART 2 STRUCTURAL DESIGN | Under Published |
38 | WRD/09/24572 | RECOMMENDATIONS FOR LIGHTING VENTILATION AND OTHER FACILITIES INSIDE DAMS | WC-Draft |
39 | WRD/10/18947 | MINIMIZING EVAPORATION LOSSES FROM RESERVOIRS - GUIDELINES | Under Published |
40 | WRD/10/21163 | OPERATION OF RESERVOIRS GUIDELINES | WC-Draft |
41 | WRD/10/23313 | PROTECTION OF SLOPE FOR RESERVOIR EMBANKMENT CODE OF PRACTICE Second Revision of IS 8237 | Under Published |
42 | WRD/10/25190 | DETERMINATION OF EFFECTS OF SEDIMENTATION IN PLANNING AND PERFORMANCE OF RESERVOIRS GUIDELINES First Revision of IS 12182 | WC-Draft |
43 | WRD/10/25635 | METHODS FOR FIXING THE CAPACITIES OF RESERVOIRS PART 1 GENERAL REQUIREMENTS Second Revision of IS 5477 Part 1 | P-Draft |
44 | WRD/10/25683 | METHODS FOR DETERMINATION OF EVAPORATION FROM RESERVOIRS Second Revision of IS 6939 | P-Draft |
45 | WRD/12/25926 | RECOMMENDATIONS FOR STRUCTURAL DESIGN OF RADIAL GATES | WC-Draft |
46 | WRD/12/25932 | DESIGN AND USE OF RUBBER SEALS FOR HYDRAULIC GATES - RECOMMENDATIONS | WC-Draft |
47 | WRD/12/26021 | RECOMMENDATIONS FOR STRUCTURAL DESIGN OF MEDIUM AND HIGH HEAD SLIDE GATES | WC-Draft |
48 | WRD/12/26022 | RECOMMENDATIONS FOR STRUCTURAL DESIGN OF FIXED-WHEEL GATES | WC-Draft |
49 | WRD/13/24522 | Laying Cement ConcreteStone slab lining on Canals-Code of Practice | P-Draft |
50 | WRD/13/24526 | UNDER-DRAINAGE OF LINED CANALS - CODE OF PRACTICE | P-Draft |
51 | WRD/13/24576 | EARTHWORK ON CANALS — CODE OF PRACTICE (Second Revision of IS 4701) | P-Draft |
52 | WRD/14/18185 | CODE OF PRACTICE FOR DESIGN OF TUNNELS CONVEYING WATER PART 4 STRUCTURAL DESIGN OF CONCRETE LINING IN ROCK | WC-Draft |
53 | WRD/14/19357 | HYDROPOWER INTAKESCRITERIA FOR HYDRAULIC DESIGN Second Revision of IS 9761 | P-Draft |
54 | WRD/15/21609 | GUIDELINES FOR PLANNING LAYOUT AND DESIGN OF CAVITIES IN UNDERGROUND HYDROELECTRIC POWER STATIONS | WC-Draft |
55 | WRD/15/25189 | Selection of Turbines Preliminary Dimensioning and Layout of Hydro-Electric Power Houses - Guidelines : Part 1 Medium and Large Power Houses | P-Draft |
56 | WRD/21/12904 | Construction, Operation and Maintenance of River Valley Projects — Safety Guidelines Part 11 Underground Excavation | Under Published |
57 | WRD/22/22122 | PLANNING AND DESIGN OF REVETMENT – GUIDELINES (First Revision of IS 14262) | WC-Draft |
58 | WRD/22/22124 | SAFETY OF BARRAGE AND WEIR STRUCTURES — GUIDELINES (First Revision of IS 12892) | WC-Draft |
59 | WRD/22/22125 | CONSTRUCTION AND MAINTENANCE OF RIVER EMBANKMENTS LEVEES GUIDELINES Second Revision of IS 11532 | WC-Draft |
60 | WRD/23/16770 | Proforma for analysis of unit rate of rock excavation by mechanical means including blasting for open excavation Second Revision of IS 10777 | WC-Draft |
61 | WRD/23/16771 | Proforma for analysis of unit rate of construction of embankment by mechanical means Second revision of IS 11638 | WC-Draft |
62 | WRD/23/16772 | Proforma for analysis of unit rate of grouting first revision of IS 13418 | WC-Draft |
63 | WRD/23/16773 | Proforma for analysis of unit rate of shotcreting guniting used in river valley projects first revision of IS 13419 | WC-Draft |
64 | WRD/23/16774 | Proforma for analysis of unit rate of dewatering first revision of IS 14590 | WC-Draft |
65 | WRD/23/16776 | Guidelines for estimating unit rate of items of works in construction of rubble masonry for river valley projects First Revision of IS 14835 | WC-Draft |
66 | WRD/23/16777 | Proforma for analysis of unit rate of shuttering formwork for concrete items first revision of IS 10421 | WC-Draft |
67 | WRD/24/23488 | GUIDELINES FOR ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN EIA EMP FOR RIVER VALLEY AND HYDRO-ELECTRIC PROJECTS | WC-Draft |
68 | WRD/24/23492 | Guidelines for Parameters and Assessment criteria for downstream flow to maintain Ecological Balance | P-Draft |
69 | WRD/24/23493 | Use of Remote Sensing and Geographical Information System in Environmental Impact Assessment and Environment Management Plan — Recommendations | WC-Draft |
70 | WRD/24/25811 | Preparation of Catchment Area Treatment (CAT) Plan — Guidelines | WC-Draft |
71 | WRD/28/24783 | GLOSSARY OF TERMS RELATED TO COASTAL ENGINEERING | P-Draft |