WIthdrawn Standards : WRD


S.No. IS Number IS Title Category Superseded By
1 IS 10061 : 1991 Proforma for analysis of unit rate of excavation of tunnels by cyclic drilling and blasting (First Revision) Code of Practice ------
2 IS 10062 : 1991 Proforma for analysis of unit rate of quarryinc rock by mechanical means (First Revision Code of Practice ------
3 IS 10160 : 1982 Proforma for analysis of unit rate of earthwork used in construction of river valley projects Code of Practice ------
4 IS 10386 : Part 6 : 1983 Safety code for construction, operation and maintenance of river valley projects: Part 6 construction Code of Practice ------
5 IS 10386 : Part 8 : 1995 Safety code for construction, operation and maintenance of riveir valley projects: Part 8 open excavation Code of Practice ------
6 IS 10751 : 1994 Planning and design of guide banks for alluvial rivers - Guidelines (First Revision) Code of Practice ------
7 IS 11228 : 1985 Recommendations for design of screw hoists for hydraulic gates Others ------
8 IS 11293 : Part 1 : 1985 Guidelines for the design of grout curtains: Part 1 earth and rockfill dams Code of Practice ------
9 IS 11293 : Part 2 : 1993 Guidelines for the design of grout curtains: Part 2 masonry and concrete gravity dams Code of Practice ------
10 IS 1193 : 1959 Methods for Measurements of Flow of Water in Open Channels Using Notches, Weirs and Flumes ------ ------
11 IS 12028 : 1987 Guidelines for Maintanance of River Embankments (Levees) ------ ------
12 IS 13218 : Part 2 : 1991 Proforma for reporting progress during construction for river valley projects: Part 2 hydel works Code of Practice ------
13 IS 13969 : 1994 Sampling of Ground water - Guidelines Others ------
14 IS 14177 : 1994 Guidelines for painting system for hydraulic gates and hoists Others ------
15 IS 14344 : 1996 Design and construction of diaphragms for under - Seepage control - Code of practice Code of Practice ------
16 IS 14574 : 1998 Measurement of liquid flow in open channels by weirs and flumes - End depth method for estlMation of flow in non - Rectangular channels with a free overfall (Approximate Method) Code of Practice ------
17 IS 14615 : Part 3 : 2018 Measurement of fluid flow by means of pressure differential devices inserted in circular crossSection conduits running full: Part 3 nozzles and venturi nozzles Code of Practice ------
18 IS 14673 : 2014 Hydrometry - Open channel flow measurement using triangular profile weirs (First Revision) Code of Practice ------
19 IS 15119 : Part 1 : 2002 Measurement of Liquid Flow in Open Channels - Part 1 : Establishment and Operation of a Gauging Station Code of Practice ------
20 IS 15466 : 2004 Rubber seals for hydraulic gates - Specification Product Specification ------
21 IS 15646 : Part 1 : 2006 Measurements of free surface flow in closed conduits : Part 1 Methods Code of Practice ------
22 IS 15646 : Part 2 : 2006 Measurements of free surface flow in closed conduits : Part 2 Equipment Code of Practice ------
23 IS 15832 : 2008 Glossary of technical terms related to environmental impact Code of Practice ------
24 IS 2912 : 1999 Liquid flow measurement in open channels - Slope - Area method (First Revision) Code of Practice ------
25 IS 2913 : 1964 Recommendation for determination of flow in tidal channels ------ ------
26 IS 2914 : 1964 Recommendations for Estimation of Discharges by Establishing Stage-discharge Relation in Open Channels ------ ------
27 IS 2915 : 1965 Instructions for Collection of Data for the Determination fof Error in Measurement of Flow by Velocity Area Methods ------ ------
28 IS 2952 : Part 1 : 1964 Recommendation for Methods of Measurement of Fluid Flow by Means of Orifice Plates and Nozzles - Part I : Incompressible Fluids ------ ------
29 IS 2952 : Part 2 : 1975 Recommendations for methods of measurement of liquid flow by means of orifice plates and nozzles: Part 2 Compressible fluids ------ ------
30 IS 3860 : 1966 Precast Cement Concreat Slabs for Cannal Lining ------ ------
31 IS 4186 : 1985 Guide for preparation of project report for river valley projects (First Revision) Code of Practice ------
32 IS/ISO 4362 : 1992 Measurement of Liquid flow in Open Channels - Trapezoidal Profile Weirs ------ ------
33 IS 4410 : Part 5 : 1982 Glossary of terms relating to river valley projects: Part v canals (First Revision) Terminology ------
34 IS 4410 : Part 6 : 1983 Glossary of terms relating to river valley projects: Part 6 reservoirs (First Revision Code of Practice ------
35 IS 4410 : Part 15 : Sec 1 : 1973 Glossary of terms relating to river valley projects: Part 15 Canal structures Section 1 General terms Terminology ------
36 IS 4410 : Part 15 : Sec 2 : 1973 Glossary of terms relating to river valley projects: Part 15 canal structures: Sec 2 transitions Terminology ------
37 IS 4410 : Part 15 : Sec 5 : 1992 Glossary of terms relating to river valley projects: Part 15 canal structures: Sec 5 cross - Drainage works (First Revision) Terminology ------
38 IS 4410 : Part 17 : 1977 Glossary of terms relating to river valley projects: Part 17 water requirements of crops Terminology ------
39 IS 4477 : Part 1 : 1967 Method of Measurement of Fluid Flow by Means of Venturi Meters - Part I : Liquids ------ ------
40 IS 4745 : 1968 Code of Practice for Design of Cross-section of Lined Canals ------ ------
41 IS 4851 : 1987 Proforma for estimating unit rate of concrete used in mechanized construction of river valley projects (Second Revision) Code of Practice ------
42 IS 4852 : 1987 Proforma for estlMating unit rate of random rubble masonry used in construction of river valley projects (Second Revision) Code of Practice ------
43 IS 4969 : 1968 Method of Test for Detemining Flexural Strength of Precast Cement Concrete Slabs for Canal Lining ------ ------
44 IS 5331 : 1969 Guide for Selection of Type of Lining for Canals ------ ------
45 IS 6059 : 1971 Recommendations for liquid flow measurement in open channels by weirs and flumes - weirs of finite crest width for free discharge ------ ------
46 IS 6065 : Part 1 : 2001 Recommendations for the preparation of geological and geotechnical maps for river valley project: Part 1 Scales ------ ------
47 IS 6531 : 1994 Canalhead regulators crtteria for design (First Revision) Code of Practice ------
48 IS 6934 : 2014 Hydraulic design of high ogee overflow and orifice spillways - Recommendations (Second Revision) Others ------
49 IS 9117 : 1979 Reccomendation for Liquid Flow Measurement in Open Channels by Weirs and Flumes - End Depth Method for Eastimation of Flow in non Rectangulars Channels with a Free Overall (Approximate Method) ------ ------
50 IS 9163 : Part 1 : 1979 Dilution Methods for Measurement of Steady Flow - Part I : Constant Rate Injection Method Code of Practice ------
51 IS 9401 : Part 15 : Sec 1 : 1993 Method of measurement of works in river valley projects (Dams and appurtenant structures): Part 15 Investigation works Section 1 Drilling of bore holes ------ ------
52 IS 9401 : Part 15 : Sec 2 : 1992 Method of Measurement of Works in River Valley Projects (dams and appurtenant structures) - Part 15 : Investigation Works - Section 2 : Exploratory Drifting ------ ------
53 IS 9401 : Part 19 : 2009 Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 19 electro - Mechanical works Code of Practice ------
54 IS 9447 : 1980 Guidelines for assessment of seepage losses from canals by analytical method Others ------
55 IS 9451 : 1994 Guidelines for lining of canals in expansive soils (Second Revision) Code of Practice ------
56 IS 9922 : 2010 Measurement of Liquid Flow in Open Channels - General Guidelines for Selection of Method Code of Practice ------