Revised Standards : WRD 23


S.No. IS Number IS Title Revision Number Category Document Comment
1 IS 10061 : 2024 Analysis of Unit Rate of Excavation of Tunnels by Cyclic Drilling and Blasting � Proforma (Second Revision) 2 ------  Buy
2 IS 10062 : 2024 Proforma for analysis of unit rate of quarrying rock by mechanical means second revision of IS 10062 2 ------  Buy
3 IS 10160 : 2024 Proforma for analysis of unit rate of earthwork used in construction of river valley projects (first revision of IS 10160) 1 ------  Buy
4 IS 10777 : 1994 Proforma for analysis of unit rate of rock excavation by mechanical means including blasting for open excavation (First Revision) 1 Code of Practice  Download
5 IS 11590 : 1995 Guidelines for working out unit rate cost of the construction equipment used for river valley projects (First Revision) 1 Code of Practice  Download
6 IS 11638 : 2000 Proforma for estimation of unit rate of construction of embankment by mechanical means (First Revision) 1 Code of Practice  Download
7 IS 4851 : 2024 Estimating Unit Rate of Concrete Used in Mechanized Construction of River Valley Projects � Proforma (Third Revision) 3 ------  Buy
8 IS 4852 : 2024 Estimating Unit Rate of Random Rubble Masonry Used in Construction of River Valley Projects � Proforma (Third Revision) 3 ------  Buy
9 IS 9401 : Part 1 : 1999 Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 1 excavation for foundation (First Revision) 1 Code of Practice  Download
10 IS 9401 : Part 2 : 2003 Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 2 dewatering (First Revision) 1 Code of Practice  Download
11 IS 9401 : Part 3 : 2003 Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 3 grouting (Second Revision) 2 Code of Practice  Download
12 IS 9401 : Part 4 : 2018 Method of measurement of works in river valley projects (dams and appurtenant structures): Part 4 Concrete work 1 Code of Practice  Download
13 IS 9401 : Part 5 : 2014 Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 5 masonry (First Revision) 1 Code of Practice  Download
14 IS 9401 : Part 6 : 2013 Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 6 ventilation pipes and other embedded Materials (First Revision) 1 Code of Practice  Download
15 IS 9401 : Part 7 : 2013 Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 7 joints (First Revision) 1 Code of Practice  Download
16 IS 9401 : Part 11 : 1998 Methods of measurement of work in river valley projects (Damsand Appurtenantstructures): Part 11 diaphragm walls (First Revision) 1 Code of Practice  Download
17 IS 9401 : Part 19 : 2022 Method of measurement of works in river valley projects Dams and appurtenant structures Part 19 Electro Mechnical Works 1 Methods of tests  Buy