SNo |
IS Number |
Title |
Technical Committee |
1 |
IS 13365 : Part 3 : 1997 |
Quantitative Classification System of Rock Mass-guidelines Part 3 Determination of Slope Mass Rating |
CED 48 |
2 |
IS 14458 : Part 1 : 1998 |
Retaining wall for hill area - Guidelines: Part 1 selection of type of wall |
CED 56 |
3 |
IS 14458 : Part 2 : 1997 |
Retaining wall for hill area - Guidelines: Part 2 design of retaining/breast walls |
CED 56 |
4 |
IS 14458 : Part 3 : 1998 |
Retaining wall for hill area - Guidelines: Part 3 Construction of dry stone walls |
CED 56 |
5 |
IS 14496 : Part 2 : 1998 |
Preparation of land slide hazard zonation maps in mountainous terrains - Guidelines: Part 2 macro - Zonation |
CED 56 |
6 |
IS 14680 : 1999 |
Landslide control - Guidelines |
CED 56 |
7 |
IS 7422 : Part 1 : 1974 |
Symbols and abbreviations for use in geological Maps: Section and subsurface exbloratory logs: Part 1 abbreviations |
WRD 5 |
8 |
IS 7422 : Part 2 : 1974 |
Symbols and abbreviations for use in geological maps: Section and subsurface exploratory logs: Part 2 igneous rocks |
WRD 5 |
9 |
IS 7422 : Part 3 : 1974 |
Symbols and abbreviations for use in geological maps: Sections and subsurface exploratory logs: Part 3 sedimentary rocks |
WRD 5 |
10 |
IS 7422 : Part 4 : 1985 |
Symbols and abbreviations for use in geological maps: Sections and subsurface exploratory logs: Part 4 metamorphic rocks |
WRD 5 |
11 |
IS 7422 : Part 5 : 1992 |
Symbols and abbreviations for use in geological maps: Sections and sub - Surface exploratory logs: Part 5 line symbols for formation contacts and structural features |
WRD 5 |
12 |
IS 14458 : Part 5 : 2018 |
Retaining wall for hill areas - Guidelines: Part 5 construction of cement stone masonry walls |
CED 56 |
13 |
IS 14458 : Part 4 : 2018 |
Retaining wall for hill area - Guidelines: Part 4 Construction of Banded Dry Stone Masonry Walls |
CED 56 |