Indian Standard Details

    Print

IS Number : IS 16242 (Part 2) : 2020
IEC 62040-2 : 2020

IS Title [Eng-Hn] : Uninterruptible Power Systems UPS Part 2 Electromagnetic Compatibility EMC Requirements ( First Revision )
No of Revision : 1
No of Amendments : 0
Technical Department : Electrotechnical Department
Technical Committee : ETD 31 ( Power Electronics )
Language : English

Group : Electronic and Telecom equipments, components and devices
Sub Group: Electronic equipments and systems
Sub Sub Group : Electromagnetic Compatibility and Electromagnetic Interference
Aspects: Methods of tests
Certification:
Ministry : Ministry of Electronics and Information Technology
Short Commom Man's Title:
Itchs:
Degree of Equivalence: Identical under dual numbering
Identical/Equivalent Standards:IEC62040-2:2016
Organisation :

Indian Standards Refered In IS IS 16242 : Part 2 : 2020 :
SNo IS Number Title Technical Committee
1
IS 14700 : Part 3 : Sec 2 : 2020 Electromagnetic Compatibility (EMC) Part 3 Limits Section 2 Limits for harmonic current emissions ( equipment input current ? 16 A per phase ) ( Third Revision ) LITD 9
2
IS 14700 : Part 4 : Sec 2 : 2018 Electromagnetic compatibility (EMC): Part 4 testing and measurement techniques: Sec 2 electrostatic discharge immunity test (Second Revision) LITD 9
3
IS 14700 : Part 4 : Sec 3 : 2018 Electromagnetic Compatibility (EMC) Part 4 Testing and Measurement Techniques Section 24 Test methods for protective devices for HEMP conducted disturbance ( First Revision ) LITD 9
4
IS 14700 : Part 4 : Sec 4 : 2018 Electromagnetic compatibility (EMC): Part 4 testing and measurement techniques: Sec 4 electrical fast transient / burst immunity test (Second Revision) LITD 9
5
IS 14700 : Part 4 : Sec 8 : 2018 Electromagnetic compatibility (EMC): Part 4 testing and measurement techniques: Sec 8 power frequency magnetic field immunity test (Second Revision) LITD 9
6
IS 14700 : Part 4 : Sec 5 : 2019 Electromagnetic compatibility (EMC): Part 4 testing and measurement techniques: Sec 5 surge immunity test (First Revision) LITD 9
7
IS 14700 : Part 4 : Sec 6 : 2016 Electromagnetic compatibility (EMC): Part 4 testing and measurement techniques: Sec 6 immunity to conducted disturbances, induced by radio - Frequency fields LITD 9
8
IS 6873 : Part 4 : 1999 Limits and Methods of Measurement of Radio Disturbance Characteristics - Part 4 : Industrial, Scientific and Medical (ISM) Radio-frequency Equipment LITD 9
9
IS 6873 : Part 7 : 2012 Limits and methods of measurement of radio disturbance characteristics: Part 7 information technology equipment (Second Revision) LITD 9
10
IS 16242 : Part 3 : 2014 Uninterruptible power systems (UPS): Part 3 method of specifying the performance and test requirements ETD 31
11
IS 10052 : Part 1 : Sec 1 : 2019 Radio Disturbance and Immunity Measuring Apparatus and Methods — Specification Part 1 Radio Disturbance and Immunity Measuring Apparatus Section 1 Measuring apparatus ( Third Revision ) LITD 9
12
IS 10052 : Part 2 : Sec 1 : 2018 Specification for radio disturbance and immunity measuring apparatus and methods: Part 2 methods of measurement of disturbances and immunity: Sec 1 conducted disturbance measurements (Second Revision) LITD 9
International Standards Refered In IS 16242 : Part 2 : 2020
SNo International Standard Number
1 IEC 60155 : 0 : 0 0
IS 16242 : Part 2 : 2020 is Refered in following Indian Standards :
SNo IS Number Title Technical Committee
1 IS 16242 : Part 1 : 2014 Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS ETD 31
2 IS 14700 : Part 4 : Sec 1 : 2019 Electromagnetic compatibility (EMC): Part 4 testing and measurement techniques: Sec 1 overview of the IEC 61000 - 4 series (Second Revision) LITD 9