SNo |
IS Number |
Title |
Technical Committee |
1 |
IS 1885 : Part 17 : 1979 |
Electrotechnical vocabulary: Part 17 switchgear and control gear (First Revision) |
ETD 1 |
2 |
IS/IEC 60695 : Part 2 : Sec 11 : 2014 |
Fire Hazard Testing Part 2-11 Glowing / Hot-Wire Based Test Methods Glow-Wire Flammability Test Method for End-Products ( GWEPT ) |
LITD 1 |
3 |
IS/IEC 60947 : PART 1 : 2020 |
LOW-VOLTAGE SWITCHGEAR AND CONTROLGEAR PART 1 GENERAL RULES |
ETD 7 |
4 |
IS 14700 : Part 4 : Sec 2 : 2018 |
Electromagnetic compatibility (EMC): Part 4 testing and measurement techniques: Sec 2 electrostatic discharge immunity test (Second Revision) |
LITD 9 |
5 |
IS 14700 : Part 4 : Sec 3 : 2018 |
Electromagnetic Compatibility (EMC) Part 4 Testing and Measurement Techniques Section 24 Test methods for protective devices for HEMP conducted disturbance ( First Revision ) |
LITD 9 |
6 |
IS 14700 : Part 4 : Sec 4 : 2018 |
Electromagnetic compatibility (EMC): Part 4 testing and measurement techniques: Sec 4 electrical fast transient / burst immunity test (Second Revision) |
LITD 9 |
7 |
IS 14700 : Part 4 : Sec 5 : 2019 |
Electromagnetic compatibility (EMC): Part 4 testing and measurement techniques: Sec 5 surge immunity test (First Revision) |
LITD 9 |
8 |
IS 14700 : Part 4 : Sec 6 : 2016 |
Electromagnetic compatibility (EMC): Part 4 testing and measurement techniques: Sec 6 immunity to conducted disturbances, induced by radio - Frequency fields |
LITD 9 |
9 |
IS 16828 : 2018 |
High - Current Test Techniques - Definitions and Requirements for Test Currents and Measuring Systems |
ETD 19 |
10 |
IS 2500 : Part 1 : 2000 |
Sampling procedures for inspection by attributes: Part 1 sampling schemes indexed by acceptance quality limit (AQL) for lot - By - Lot inspection (Third Revision) |
MSD 3 |
11 |
IS/CISPR 32 : 2015 |
Electromagnetic Compatibility of Multimedia Equipment Emission Requirements |
LITD 9 |
12 |
IS/IEC 60269 : Part 1 : 2014 |
Low-Voltage Fuses Part 1 General Requirements |
ETD 39 |
13 |
IS/IEC 60269 : Part 2 : 2016 |
Low-Voltage Fuses Part 2 Supplementary Requirements for Fuses for Use by Authorized Persons ( Fuses Mainly for Industrial Application ) - Examples of Standardized Systems of Fuses A to K |
ETD 39 |
14 |
IS/IEC 60269 : Part 2 : 2016 |
Low-Voltage Fuses Part 2 Supplementary Requirements for Fuses for Use by Authorized Persons ( Fuses Mainly for Industrial Application ) - Examples of Standardized Systems of Fuses A to K |
ETD 39 |
15 |
IS/IEC 60269 : Part 3 : 2010 |
Low-Voltage Fuses Part 3 Supplementary Requirements for Fuses for Use by Unskilled Persons ( Fuses Mainly for Household and Similar Applications ) — Examples of Standardized Systems of Fuses A to F |
ETD 39 |
16 |
IS/IEC/TR 60269 : Part 5 : 2014 |
Low-Voltage Fuses Part 5 Guidance for the Application of Low-Voltage Fuses |
ETD 39 |
17 |
IS/IEC 60269 : Part 6 : 2010 |
Low-Voltage Fuses Part 6 Supplementary Requirements for Fuse-Links for the Protection of Solar Photovoltaic Energy Systems |
ETD 39 |