SNo |
IS Number |
Title |
Technical Committee |
1 |
IS 2809 : 1972 |
Glossary of terms and symbols relating to soil engineering (First Revision) |
CED 43 |
2 |
IS 5477 : Part 1 : 1999 |
Fixing the capacities of reservoirs methods: Part 1 general requirements (First Revision) |
WRD 10 |
3 |
IS 5477 : Part 4 : 2019 |
Methods for fixing the capacities of reservoirs: Part 4 surcharge storage (First Revision) |
WRD 10 |
4 |
IS 5050 : 1992 |
Code ofpractice for design, construction and maintenance of relief wells (First Revision) |
WRD 8 |
5 |
IS 4999 : 1991 |
Recommendations for grouting of pervious soils (First Revisign) |
WRD 8 |
6 |
IS 1498 : 1970 |
Classification and identification of soils for general engineering purposes (First Revision) |
CED 43 |
7 |
IS 8237 : 1985 |
Code of practice for protection of slope for reservoir embankment (First Reoision) |
WRD 10 |
8 |
IS 9429 : 1999 |
Drainage system for earth and rockfill dams - Code of practice (First Revision) |
WRD 9 |
9 |
IS 8414 : 2014 |
Guidelines for design of under seepage control measures for earth and rockfill dams (First Revision) |
WRD 8 |
10 |
IS 7894 : 1975 |
Code of practice for stability analysis of earth dams |
WRD 9 |
11 |
IS 7436 : Part 1 : 1993 |
Guide fort ypes of measurements for structures in river valley projekts and critbria for choice and location of measuring instruments: Part 1 for earth and rockfill dams (First Revision) |
WRD 16 |