SNo |
IS Number |
Title |
Technical Committee |
1 |
IS 4410 : Part 10 : 1988 |
Glossary of terms relating to river valley projects: Part 10 hydro - Electric power station including water conductor system (First Revision) |
WRD 15 |
2 |
IS 7396 : Part 1 : 1985 |
Criteria for hydraulic design of surge tanks: Part 1 simple, restricted orifice and differential surge tanks (First Revision) |
WRD 14 |
3 |
IS 456 : 2000 |
Plain and reinforced concrete - Code of practice (Fourth Revision) |
CED 2 |
4 |
IS 4880 : Part 5 : 1972 |
Code of practice for design of tunnels conveying water: Part 5 structural design of concrete lining lIu soft strata and soils |
WRD 14 |
5 |
IS 432 : Part 1 : 1982 |
Specification for Mild Steel and Medium Tensile Steel Bars and Hard-Drawn Steel Wire for Concrete Reinforcement: Part 1 Mild Steel and Medium Tensile Steel Bars (Third revision) |
CED 54 |
6 |
IS 432 : Part 2 : 1982 |
Specification for Mild Steel and Medium Tensile Steel Bars and Hard-Drawn Steel Wire for Concrete Reinforcement: Part 2 Hard-Drawn Steel Wire (Third Revision) |
CED 54 |
7 |
IS 1139 : 1966 |
Specification for Hot rolled mild steel, medium tensile steel and high yield strength steel deformed bars for concrete reinforcements |
CED 2 |
8 |
IS 1786 : 2008 |
High Strength Deformed Steel Bars and Wires for Concrete Reinforcement - Specification (Fourth Revision) |
CED 54 |
9 |
IS 5878 : Part 3 : 1972 |
Code of practice for construction of tunnels: Part 3 underground excavation in soft strata |
WRD 14 |