SNo |
IS Number |
Title |
Technical Committee |
1 |
IS 5529 Part 1 : 2013 |
In-situ permeability test Part 1 Test in overburden - Code of practice |
WRD 5 |
2 |
IS 11293 : Part 2 : 1993 |
Guidelines for the design of grout curtains: Part 2 masonry and concrete gravity dams |
WRD 8 |
3 |
IS 9401 : Part 3 : 2003 |
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 3 grouting (Second Revision) |
WRD 23 |
4 |
IS 5878 : Part 7 : 1972 |
Code of practice for construction of tunnels conveying water: Part 7 grouting |
WRD 14 |
5 |
IS 11155 : 2019 |
Construction of spillways and similar overflow structures - Code of practice (Second Revision) |
WRD 9 |
6 |
IS 14954 : 2001 |
Distress and remedial measures in earth and rockfill dams - Guidelines |
WRD 9 |
7 |
IS 11973 : 1986 |
Code of practice for treatment of rock foundations, core and abutment contacts with rock, for embankment dams |
WRD 8 |
8 |
IS 10270 : 1982 |
Guidelines for design and construction of prestressed rock anchors |
CED 43 |
9 |
IS 13063 : 1991 |
Structural safety of buildings on shallow foundations on rocks - Code of practice |
CED 48 |
10 |
IS 11309 : 1985 |
Method of conducting pull-out test on anchor bars and rock bolts |
CED 48 |
11 |
IS 10386 : Part 6 : 1983 |
Safety code for construction, operation and maintenance of river valley projects: Part 6 construction |
WRD 21 |
12 |
IS/ISO 22915 : Part 17 : 2020 |
INDUSTRIAL TRUCKS VERIFICATION OF STABILITY PART 17: TOWING TRACTOTRS BURDEN AND PERSONNEL CARRIERS |
TED 22 |