WRD13 : Canals And Cross Drainage Works
- Scope : Standardization of criteria for planning, location, design, construction, inspection, maintenance and other related aspects for canals and cross drainage works.
-
Liaison :
IS 10430 : 2000 Reviewed In : 2024 |
Criteria for design of lined canals and guidance for selection of type of lining (First Revision)
|
September, 2024
|
1
|
Indigenous
|
|
IS 10646 : 1991 Reviewed In : 2024 |
Canal linings - Cementconcrete tiles - Specification (First Revision)
|
September, 2024
|
3
|
Indigenous
|
|
IS 11570 : 1985 Reviewed In : 2024 |
Criteriafor hydraulic design of irrigation intake structures
|
March, 2024
|
1
|
Indigenous
|
|
IS 11809 : 1994 Reviewed In : 2024 |
Lining for canals by stone masonry - Code of practice (First Revision)
|
September, 2024
|
2
|
Indigenous
|
|
IS 12331 : 1988 Reviewed In : 2022 |
General requirements for canal outlets
|
August, 2022
|
1
|
Indigenous
|
|
IS 12379 : 1988 Reviewed In : 2022 |
Code of practice for lining of water - Courses and field channels
|
August, 2022
|
2
|
Indigenous
|
|
IS 13143 : 1991 Reviewed In : 2024 |
Jointsin concreteliningofcanals - Sealing compound - Specification
|
March, 2024
|
-
|
Indigenous
|
|
IS 16238 : 2017 Reviewed In : 2022 |
Planning of parallel canals - Guidelines
|
April, 2022
|
-
|
Indigenous
|
|
IS 16472 : 2016 Reviewed In : 2021 |
Design and construction of water courses - Guidelines
|
February, 2021
|
-
|
Indigenous
|
|
IS 3872 : 2002 Reviewed In : 2022 |
Lining of canals with burnt clay tiles - Code of practice (First Revision)
|
August, 2022
|
1
|
Indigenous
|
|
IS 3873 : 1993 Reviewed In : 2024 |
Laying .cement concrete/stone slab lining on canals - Code of practice (Second Revision)
|
September, 2024
|
1
|
Indigenous
|
|
IS 4410 (Part 5) : 2023 |
GLOSSARY OF TERMS RELATING TO RIVER VALLEY PROJECTS PART 5 CANALS (Second Revision)
|
-
|
Indigenous
|
||
IS 4410 (Part 15/Sec 1) : 2023 |
GLOSSARY OF TERMS RELATING TO RIVER VALLEY PROJECTS PART 15 CANAL STRUCTURES Section 1 General Terms
|
-
|
Indigenous
|
||
IS 4410 (Part 15/Sec 2) : 2023 |
GLOSSARY OF TERMS RELATING TO RIVER VALLEY PROJECTS PART 15 CANAL STRUCTURES Section 2 Transitions
|
-
|
Indigenous
|
||
IS 4410 (Part 15/Sec 3) : 1977 Reviewed In : 2020 |
Glossary of terms relating to river valley projects: Part 15 canal structures: Sec 3 flume.
|
March, 2020
|
-
|
Indigenous
|
|
IS 4410 (Part 15/Sec 4) : 1977 Reviewed In : 2020 |
Glossary of terms relating to river valley projects: Part 15 canal structures: Sec 4 regulating works
|
March, 2020
|
-
|
Indigenous
|
|
IS 4410 (Part 15/Sec 5) : 2023 |
GLOSSARY OF TERMS RELATING TO RIVER VALLEY PROJECTS PART 15 CANAL STRUCTURES Section 5 Cross-Drainage Works
|
-
|
Indigenous
|
||
IS 4515 : 2002 Reviewed In : 2022 |
Stone pitched lining for canals - Code of practice (Second Revision)
|
August, 2022
|
-
|
Indigenous
|
|
IS 4558 : 1995 Reviewed In : 2021 |
Under - Drainage of lined canals - Code of practice (Second Revision)
|
February, 2021
|
1
|
Indigenous
|
|
IS 4701 : 1982 Reviewed In : 2024 |
Code of practice for earthwork on canals (First Revision
|
September, 2024
|
-
|
Indigenous
|
|
IS 4839 (Part 1) : 1992 Reviewed In : 2022 |
Maintenance of canals code of practice: Part 1 unlined canals (Second Revision)
|
August, 2022
|
1
|
Indigenous
|
|
IS 4839 (Part 2) : 1992 Reviewed In : 2021 |
Maintenance of canals - Codb of practice: Part 2 lined canals (Second Revision)
|
February, 2021
|
1
|
Indigenous
|
|
IS 4839 (Part 3) : 1992 Reviewed In : 2022 |
Code of practice for maintenance of canals: Part 3 canal structures, drains, outlets, jungle, clearance, plantation and regulation f second revision)
|
August, 2022
|
1
|
Indigenous
|
|
IS 5256 : 1992 Reviewed In : 2022 |
Sealing expansion joints in concrete lining of canals - Code of practice (First Revision)
|
August, 2022
|
-
|
Indigenous
|
|
IS 5690 : 1982 Reviewed In : 2024 |
Guide for laying combination lining for existing unlined canals (First Revision)
|
September, 2024
|
1
|
Indigenous
|
|
IS 5968 : 1987 Reviewed In : 2022 |
Guide for planning and layout of canal system for krrlGatlOn (First Revision)
|
August, 2022
|
-
|
Indigenous
|
|
IS 6004 : 1980 Reviewed In : 2024 |
Criteria for hydraulic design of sediment ejector for irrigation and power channels (First Revision)
|
September, 2024
|
-
|
Indigenous
|
|
IS 6522 : 1972 Reviewed In : 2024 |
Criteria for design of silt vanes for sediment control in offtaking canals
|
September, 2024
|
-
|
Indigenous
|
|
IS 6531 : 2021 |
Canal head regulators criteria for design Second Revision
|
-
|
Indigenous
|
||
IS 6936 : 1992 Reviewed In : 2022 |
Guide for location, selection and hydraulic design of canal escapes (First Revision)
|
August, 2022
|
-
|
Indigenous
|
|
IS 7112 : 2002 Reviewed In : 2022 |
Criteria for design of cross -: Sec for unlined canals in alluvial soil (First Revision)
|
August, 2022
|
-
|
Indigenous
|
|
IS 7113 : 2003 Reviewed In : 2022 |
Soil - Cement lining for canals - Code of practice (First Revision)
|
August, 2022
|
1
|
Indigenous
|
|
IS 7114 : 1973 Reviewed In : 2024 |
Criteria for hydraulic destgn of cross regulators for canals
|
September, 2024
|
-
|
Indigenous
|
|
IS 7331 : 1981 Reviewed In : 2022 |
Code of practice for inspbction and maintenance of cross drainage works (First Revision)
|
August, 2022
|
-
|
Indigenous
|
|
IS 7495 : 1974 Reviewed In : 2024 |
Criteria for hydraulic design of silt selective head regulator for sediment control in offtaking canals
|
August, 2024
|
-
|
Indigenous
|
|
IS 7784 (Part 1) : 2013 Reviewed In : 2024 |
Design of cross drainage works - Code of practice: Part 1 general features (Second Revision)
|
September, 2024
|
-
|
Indigenous
|
|
IS 7784 (Part 2/Sec 1) : 1995 Reviewed In : 2020 |
Design of cross drainage works code of practice: Part 2 specific requirements: Sec 1 aqueducts (First Revision J
|
March, 2020
|
-
|
Indigenous
|
|
IS 7784 (Part 2/Sec 2) : 2000 Reviewed In : 2024 |
Code of practice for design of cross drainage works: Part 2 specific requirements: Sec 2 superpassages (First Revision)
|
September, 2024
|
1
|
Indigenous
|
|
IS 7784 (Part 2/Sec 3) : 1996 Reviewed In : 2021 |
Code of practice for design of cross drainage works: Part 2 specific requirements: Sec 3 canal slrphons (First Revision)
|
February, 2021
|
-
|
Indigenous
|
|
IS 7784 (Part 2/Sec 4) : 1999 Reviewed In : 2024 |
Design of cross drainage works - Code of practice: Part 2 specific requirements: Sec 4 level crossings (First Revision)
|
August, 2024
|
-
|
Indigenous
|
|
IS 7784 (Part 2/Sec 5) : 2000 Reviewed In : 2024 |
Code of practice for design of cross drainage works part2 specific requirements: Sec 5 syphon aqueducts (First Revision)
|
September, 2024
|
1
|
Indigenous
|
|
IS 7871 : 1975 Reviewed In : 2024 |
Criteria for hydraulic design of groyne walls (Curved Wing) for sediment distribution at offtake points in a canal
|
March, 2024
|
-
|
Indigenous
|
|
IS 7873 : 1975 Reviewed In : 2024 Decision taken to Reaffirm and Archive |
Code of practice for limb concrete lining for canals
|
March, 2024
|
1
|
Indigenous
|
|
IS 7880 : 1975 Reviewed In : 2024 |
Criteria for hydraulic design qf skimming platform for sediment control in offtaking canal
|
September, 2024
|
-
|
Indigenous
|
|
IS 7986 : 1976 Reviewed In : 2024 |
Code of practice for canal outlets
|
September, 2024
|
1
|
Indigenous
|
|
IS 8835 : 1978 Reviewed In : 2024 |
Guidelines for planning and design of surface drains
|
September, 2024
|
-
|
Indigenous
|
|
IS 9097 : 1979 Reviewed In : 2024 |
Guide for laying lining of canals with hot bitumen or bituminous felts
|
March, 2024
|
-
|
Indigenous
|
|
IS 9447 : 2023 |
Assessment of Seepage Losses in Canals by Analytical method- Guidelines ( first revision)
|
-
|
Indigenous
|
||
IS 9451 : 2022 |
Guidelines for Lining of Canals in Expansive Soils Third Revision
|
-
|
Indigenous
|
||
IS 9452 (Part 1) : 1993 Reviewed In : 2024 |
Measurement of seepage losses from canals - Code of practice: Part 1 Ponding method
|
March, 2024
|
-
|
Indigenous
|
|
IS 9452 (Part 2) : 1980 Reviewed In : 2024 |
Code of practice for measurement of seepage losses from canals: Part 2 inflow - O - utflow method
|
March, 2024
|
-
|
Indigenous
|
|
IS 9452 (Part 3) : 1988 Reviewed In : 2024 |
Code of practice for measurement of seepage losses from canals: Part 3 seepage meter method
|
March, 2024
|
-
|
Indigenous
|
|
IS 9698 : 1995 Reviewed In : 2020 |
Lining of canals with polyethylene film - Code of practice (First Revision)
|
March, 2020
|
1
|
Indigenous
|
|
IS 9913 : 2000 Reviewed In : 2024 |
Code of practice for construction of cross drainage works (First Revision)
|
September, 2024
|
1
|
Indigenous
|
No Records Found |
WRD 13 (24522)
Revision of: IS 3873:1993 |
Laying Cement ConcreteStone slab lining on Canals-Code of Practice |
|
WRD 13 (24526)
Revision of: IS 4558:1995 |
UNDER-DRAINAGE OF LINED CANALS - CODE OF PRACTICE |
|
WRD 13 (24576)
Revision of: IS 4701:1982 |
EARTHWORK ON CANALS CODE OF PRACTICE Second Revision of IS 4701 |
No Records Found |
No Records Found |
No Records Found |
No Records Found |
|
IS 3860 : 1966 Reviewed In : 2003 |
Precast Cement Concreat Slabs for Cannal Lining |
|
IS 4745 : 1968 |
Code of Practice for Design of Cross-section of Lined Canals |
|
IS 4969 : 1968 |
Method of Test for Detemining Flexural Strength of Precast Cement Concrete Slabs for Canal Lining |
|
IS 5331 : 1969 |
Guide for Selection of Type of Lining for Canals |
IS 10646 : 1991 Reviewed In : 2024 |
Canal linings - Cementconcrete tiles - Specification First Revision |
|
IS 13143 : 1991 Reviewed In : 2024 |
Jointsin concreteliningofcanals - Sealing compound - Specification |