Programme of work


BUREAU OF INDIAN STANDARDS


Water Resources Department

Programme of Work




WRD23 : Measurement and Cost Analysis of Works for River Valley Projects


  • Scope : Standardization in the field of measurement and cost analysis of civil engineering works for water resource projects.
  • Liaison :

Published Standards

SI. No.
IS No.
Title
Reaffirmation Details
No. of Amendments
Degree of Equivalence
1.
IS 10061 : 2024
Analysis of Unit Rate of Excavation of Tunnels by Cyclic Drilling and Blasting � Proforma (Second Revision)
-
Indigenous
2.
IS 10062 : 2024
Proforma for analysis of unit rate of quarrying rock by mechanical means second revision of IS 10062
-
Indigenous
3.
IS 10160 : 2024
Proforma for analysis of unit rate of earthwork used in construction of river valley projects (first revision of IS 10160)
-
Indigenous
4.
IS 10421 : 1983
Reviewed In : 2021
Proforma for analysis of unit rate of shuttering/formwork for concrete items
March, 2021
-
Indigenous
5.
IS 10777 : 1994
Reviewed In : 2021
Proforma for analysis of unit rate of rock excavation by mechanical means including blasting for open excavation (First Revision)
March, 2021
-
Indigenous
6.
IS 11399 (Part 1) : 1985
Reviewed In : 2021
Guidelines for estimating output norms of items of work in construction of river valley projects pzyxwvutsrqponmlkjihgfedcbaZyxwvutsrqponmlkjihgfedcba: Part 1 earthwork excavation
March, 2021
2
Indigenous
7.
IS 11590 : 1995
Reviewed In : 2021
Guidelines for working out unit rate cost of the construction equipment used for river valley projects (First Revision)
March, 2021
-
Indigenous
8.
IS 11638 : 2000
Reviewed In : 2021
Proforma for estimation of unit rate of construction of embankment by mechanical means (First Revision)
March, 2021
-
Indigenous
9.
IS 13418 : 1992
Reviewed In : 2023
Proforma for analysis of unit rate of grouting used in river valley projects
January, 2023
-
Indigenous
10.
IS 13419 : 1992
Reviewed In : 2023
Proforma for analysis of unit rate of shotcreting/guniting used in river ivalley projects
January, 2023
-
Indigenous
11.
IS 14590 : 1998
Reviewed In : 2023
Proforma for analysis of unit rate of dewatering
January, 2023
-
Indigenous
12.
IS 14749 : 2000
Reviewed In : 2021
Proforma for analysis of unit rate of underground excavation by cyclic drilling and blasting
March, 2021
-
Indigenous
13.
IS 14835 : 2000
Reviewed In : 2021
Guidelines for estimating unit rate of items of works in construction of rubble masonry for river valley projects
March, 2021
-
Indigenous
14.
IS 4851 : 2024
Estimating Unit Rate of Concrete Used in Mechanized Construction of River Valley Projects � Proforma (Third Revision)
-
Indigenous
15.
IS 4852 : 2024
Estimating Unit Rate of Random Rubble Masonry Used in Construction of River Valley Projects � Proforma (Third Revision)
-
Indigenous
16.
IS 4877 : 1968
Reviewed In : 2021
Guide for preparation of estimate for river valley projects
March, 2021
-
Indigenous
17.
IS 9401 (Part 1) : 1999
Reviewed In : 2021
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 1 excavation for foundation (First Revision)
March, 2021
-
Indigenous
18.
IS 9401 (Part 2) : 2003
Reviewed In : 2022
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 2 dewatering (First Revision)
December, 2022
-
Indigenous
19.
IS 9401 (Part 3) : 2003
Reviewed In : 2022
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 3 grouting (Second Revision)
December, 2022
-
Indigenous
20.
IS 9401 (Part 4) : 2018

Reviewed In : 2023
Method of measurement of works in river valley projects (dams and appurtenant structures): Part 4 Concrete work
September, 2023
-
Indigenous
21.
IS 9401 (Part 5) : 2014
Reviewed In : 2024
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 5 masonry (First Revision)
May, 2024
-
Indigenous
22.
IS 9401 (Part 6) : 2013
Reviewed In : 2022
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 6 ventilation pipes and other embedded Materials (First Revision)
December, 2022
-
Indigenous
23.
IS 9401 (Part 7) : 2013
Reviewed In : 2022
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 7 joints (First Revision)
December, 2022
-
Indigenous
24.
IS 9401 (Part 8) : 1985
Reviewed In : 2020
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 8 instrumentation
February, 2020
1
Indigenous
25.
IS 9401 (Part 9) : 1987
Reviewed In : 2022
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 9 lining
July, 2022
-
Indigenous
26.
IS 9401 (Part 10) : 1990
Reviewed In : 2022
Method ofmeasurementofworks in river valley projects(Dams - And Appurtenant Structures): Part 10 formwork
July, 2022
-
Indigenous
27.
IS 9401 (Part 11) : 1998
Reviewed In : 2022
Methods of measurement of work in river valley projects (Damsand Appurtenantstructures): Part 11 diaphragm walls (First Revision)
July, 2022
-
Indigenous
28.
IS 9401 (Part 12) : 1992
Reviewed In : 2022
Method of measurement of works in river valley projects (Dams And Appurtenant Structures)
July, 2022
1
Indigenous
29.
IS 9401 (Part 13) : 1992
Reviewed In : 2022
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 13 earth and fill dams
July, 2022
-
Indigenous
30.
IS 9401 (Part 14) : 1992
Reviewed In : 2022
Method of measurement of works in river valley projects (Damsand Appurtenantstructures): Part 14 canal works
July, 2022
-
Indigenous
31.
IS 9401 (Part 15) : 2010
Reviewed In : 2020
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 15 investigation works - Drilling of bore holes and exploratory drifting and logging
February, 2020
-
Indigenous
32.
IS 9401 (Part 16) : 1999
Reviewed In : 2021
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 16 tunneling
March, 2021
-
Indigenous
33.
IS 9401 (Part 17) : 1999
Reviewed In : 2021
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 17 hydromechanical and related metal works
March, 2021
-
Indigenous
34.
IS 9401 (Part 18) : 2000
Reviewed In : 2021
Method of measurement of work in river valley projects (Dams And Appurtenant Structures): Part 18 sheet pilcng
March, 2021
-
Indigenous
35.
IS 9401 (Part 19) : 2022
Reviewed In : 2022
Method of measurement of works in river valley projects Dams and appurtenant structures Part 19 Electro Mechnical Works
-
Indigenous
36.
IS 9401 (Part 20) : 2013
Reviewed In : 2022
Method of measurement of works in river valley projects (Dams And Appurtenant Structures): Part 20 protection works
December, 2022
-
Indigenous

Standards Under Develpoment

Projects Approved

SI. No.
Doc No
TITLE
No Records Found

Preliminary Draft Standards

SI. No.
Doc No
TITLE
No Records Found

Drafts Standards in WC Stage

SI. No.
Doc No
TITLE
1
WRD 23 (16776)
Revision of: IS 14835:2000
Guidelines for estimating unit rate of items of works in construction of rubble masonry for river valley projects First Revision of IS 14835

Draft Standards Completed WC Stage

SI. No.
Doc No
TITLE
1
WRD 23 (16770)
Revision of: IS 10777:1994
Proforma for analysis of unit rate of rock excavation by mechanical means including blasting for open excavation Second Revision of IS 10777
2
WRD 23 (16771)
Revision of: IS 11638:2000
Proforma for analysis of unit rate of construction of embankment by mechanical means Second revision of IS 11638
3
WRD 23 (16772)
Revision of: IS 13418:1992
Proforma for analysis of unit rate of grouting first revision of IS 13418
4
WRD 23 (16773)
Revision of: IS 13419:1992
Proforma for analysis of unit rate of shotcreting guniting used in river valley projects first revision of IS 13419
5
WRD 23 (16774)
Revision of: IS 14590:1998
Proforma for analysis of unit rate of dewatering first revision of IS 14590
6
WRD 23 (16777)
Revision of: IS 10421:1983
Proforma for analysis of unit rate of shuttering formwork for concrete items first revision of IS 10421

Finalized Draft Indian Standard

SI. No.
Doc No
TITLE
No Records Found

Finalized Draft Indian Standards under Print

SI. No.
Doc No
TITLE
No Records Found


Aspect Wise Report

 
 Product:   0
 Code of Practices :    36
 Methods of Test :   0
 Terminology :   0
 Dimensions :   0
 System Standard :   0
 Safety Standard :   0
 Others :    0
 Service Specification :    0
 Process Specification :    0
 Unclassified :    0
 


Annexure-I :List of Indian Standards Withdrawn/Superseded

SI. No.
IS No.
Title
1.
IS 9401 (Part 15/Sec 1) : 1993
Reviewed In : 2007
Method of measurement of works in river valley projects Dams and appurtenant structures Part 15 Investigation works Section 1 Drilling of bore holes
2.
IS 9401 (Part 15/Sec 2) : 1992
Reviewed In : 2007
Method of Measurement of Works in River Valley Projects dams and appurtenant structures - Part 15 Investigation Works - Section 2 Exploratory Drifting


Annexure-II :List of Indian Product Standards

SI. No.
IS No. & Year
Title
No Records Found