BUREAU OF INDIAN STANDARDS
Programme of Work
WRD15 : Hydroelectric Power House Structures
- Scope : Standardization of criteria for location, design, construction and maintenance of power house structures, including pumped storage.
-
Liaison :
IS 10824 : 1984 Reviewed In : 2021 |
Code of practice for amenities in hydroelectric power houses
|
October, 2021
|
-
|
Indigenous
|
|
IS 12800 (Part 1) : 1993 Reviewed In : 2023 |
Guideltnbs for selectjon of turbines, preliminary dimensioning and layout of surface hydro - Electric powerhouses: Part 1 medium and large power houses
|
January, 2023
|
-
|
Indigenous
|
|
IS 12800 (Part 2) : 1989 Reviewed In : 2021 |
Guidelines For Selection Of Turbines, Preliminary Dimensioning And Layout Of Surface Hydro-electric Power House Part 2 Pumped Storage Power Houses
|
October, 2021
|
2
|
Indigenous
|
|
IS 12800 (Part 3) : 1991 Reviewed In : 2023 |
Guidelines for selection of hydraulic turbine,preliminary dimensioning and layout of surface hydroelectric power houses: Part 3 small, mini
|
January, 2023
|
-
|
Indigenous
|
|
IS 12837 : 1989 Reviewed In : 2021 |
Hydraulic turbines for medium and large power houses - Guidelines for selection
|
October, 2021
|
1
|
Indigenous
|
|
IS 4247 (Part 1) : 1993 Reviewed In : 2023 |
Structural design of surface hydroelectric power stations: Part 1 data for design - Code of practice (Third Revision)
|
January, 2023
|
1
|
Indigenous
|
|
IS 4247 (Part 2) : 1992 Reviewed In : 2023 |
Code of practice for structural design of surface hydroelectric power station: Part 2 superstructure (Second Revision)
|
January, 2023
|
1
|
Indigenous
|
|
IS 4247 (Part 3) : 1998 Reviewed In : 2023 |
Code of practicefor structural design of surfacehydel power stations: Part 3 sub - Structure (Second Revision)
|
January, 2023
|
-
|
Indigenous
|
|
IS 4410 (Part 10) : 1988 Reviewed In : 2023 |
Glossary of terms relating to river valley projects: Part 10 hydro - Electric power station including water conductor system (First Revision)
|
January, 2023
|
-
|
Indigenous
|
|
IS 4461 : 1998 Reviewed In : 2023 |
Code of practice for joints in surface hydroelectric power stations (Second Revision)
|
January, 2023
|
-
|
Indigenous
|
|
IS 4720 : 2020 Reviewed In : 2020 |
Ventilation of Surface Hydel Power Stations — Code of Practice ( Second Revision )
|
-
|
-
|
Indigenous
|
|
IS 4721 : 2014 Reviewed In : 2024 |
Code of practice for drainage and dewatering of surface/ underground hydroelectric power stations (Second Revision)
|
August, 2024
|
-
|
Indigenous
|
|
IS 5496 : 1993 Reviewed In : 2023 |
Guide for preliminary dimensioning and layout of elbow type draft tubes for surface hydroelectric power stations (First Re Vision)
|
December, 2023
|
2
|
Indigenous
|
|
IS 7207 : 1992 Reviewed In : 2023 |
Criteria for design of generator foundation for hydroelectric powe rstations (First Revision)
|
January, 2023
|
-
|
Indigenous
|
|
IS 7418 : 1991 Reviewed In : 2023 |
Criteria for design of spiral casing (Concrete And Steel) (First Rewsion)
|
January, 2023
|
-
|
Indigenous
|
|
IS 9120 : 1979 Reviewed In : 2023 |
Guidelines for planning, layout and design of cavities in underground hydroelectric power stations
|
January, 2023
|
-
|
Indigenous
|
No Records Found |
WRD 15 (25189)
Revision of: IS 12800:1993 |
Selection of Turbines Preliminary Dimensioning and Layout of Hydro-Electric Power Houses - Guidelines Part 1 Medium and Large Power Houses |
No Records Found |
WRD 15 (21609)
Revision of: IS 9120:1979 |
GUIDELINES FOR PLANNING LAYOUT AND DESIGN OF CAVITIES IN UNDERGROUND HYDROELECTRIC POWER STATIONS |
No Records Found |
No Records Found |
|