1 |
WRD-1 |
Hydrometry |
ISO TC 30
|
Measurement of fluid flow in closed conduits |
Observer
|
2 |
WRD-1 |
Hydrometry |
ISO TC 30 / SC 2
|
Pressure differential devices |
Observer
|
3 |
WRD-1 |
Hydrometry |
ISO TC 30 / SC 5
|
Velocity and mass methods |
Participating
|
4 |
WRD-1 |
Hydrometry |
ISO TC 30 / SC 7
|
Volume methods including water meters |
Observer
|
5 |
WRD-1 |
Hydrometry |
ISO TC 113
|
Hydrometry |
Observer
|
6 |
WRD-1 |
Hydrometry |
ISO TC 113 / SC 1
|
Velocity area methods |
Observer
|
7 |
WRD-1 |
Hydrometry |
ISO TC 113 / SC 2
|
Flow measurement structures |
Participating
|
8 |
WRD-1 |
Hydrometry |
ISO TC 113 / SC 5
|
Instruments, equipment and data management |
Participating
|
9 |
WRD-1 |
Hydrometry |
ISO TC 113 / SC 6
|
Sediment transport |
Participating
|
10 |
WRD-3 |
Ground Water and Related Investigations |
ISO TC 113 / SC 8
|
Ground water |
Participating
|
11 |
WRD-3 |
Ground Water and Related Investigations |
ISO TC 319
|
Karst |
Observer
|
12 |
WRD-29 |
Small Hydropower Plants |
ISO TC 339
|
Small hydropower plants (SHP plants) |
Participating
|