S No Group Number Task Date of creation Time Frame No of Members
1. WRD 08 : WG01 Foundation treatment for barrages on gravelly and boundary reaches. Preparation of a draft document based on the existing literature and expertise so that the draft can be used as a Preliminary draft for formulation of a new standard. 17-10-2024 17-10-2024 5
2. WRD 08 : WG02 Revision of IS 6066: 1994 Pressure Grouting of Rock Foundations in River Valley Projects – Recommendations. Preparation of a draft document based on the existing standard so that the draft can be used as a Preliminary draft for formulation of a new standard. 17-10-2024 17-10-2024 4