S No Group Number Task Date of creation Time Frame No of Members
1. ETD 28 : WG02 To study and prepare report on floating solar PV plant standardization and prepare working drafts for the Floatovolatic systems. 04-04-2024 04-11-2024 5
2. ETD 28 : WG03 Sub-sector WG responsible for preparation of standards on "PV Systems, tests and support structures" 11-12-2024 31-12-2026 3
3. ETD 28 : WG04 Preparation and review of Indian Standards for sector - "Modules, non concentrating" 11-12-2024 31-12-2026 3
4. ETD 28 : WG05 Preparation and review of Indian Standards under sub-sector "Concentrator modules" 11-12-2024 03-12-2026 0
5. ETD 28 : WG06 Preparation and review of Indian Standards under Sub-sector "Renewable energy off grid systems, including access to electricity, rural electrification and hybrid systems" 11-12-2024 31-12-2026 1
6. ETD 28 : WG07 Preparation of a draft standard on Sustainability in the area of Solar PV. The WG would first submit a white paper on the subject before drafting a document within a period of 30 days. 11-12-2024 17-03-2025 5