1. |
ETD 20 : WG02 |
Revision of IS 4648:1968 Guide for Electrical Layout in Residential Buildings
a. Conduct an extensive study and comparative analysis of existing literature, research papers, international standards, and any other published information .
b. Evaluate the level of manufacturing bases in the country to understand the capabilities and quality of production facilities.
c. Assess the testing infrastructure in the country to determine the availability and adequacy of facilities for conducting product testing and quality assurance.
d. Identifying the potential advantages, limitations, and challenges associated with implementing Earthing systems in various sectors such as residential, commercial, and industrial and propose draft requirements to be included in the revision of IS 4648. |
18-07-2024 |
18-11-2024 |
3
|
2. |
ETD 20 : WG03 |
Revision of IS 8061:1976 Code of Practice for Design Installation and Maintenance of Service Lines up to and Including 650 V
a. Conduct an extensive study and comparative analysis of existing literature, research papers, international standards, and any other published information .
b. Evaluate the level of manufacturing bases in the country to understand the capabilities and quality of production facilities.
c. Assess the testing infrastructure in the country to determine the availability and adequacy of facilities for conducting product testing and quality assurance. |
02-11-2024 |
31-05-2025 |
3
|
3. |
ETD 20 : WG04 |
Revision of IS 8923:1978 Warning symbol for dangerous voltages and Revision of: IS 2551:1982 Danger Notice Plates
a. Conduct an extensive study and comparative analysis of existing literature, research papers, international standards, and any other published information .
b. Evaluate the level of manufacturing bases in the country to understand the capabilities and quality of production facilities.
c. Assess the testing infrastructure in the country to determine the availability and adequacy of facilities for conducting product testing and quality assurance. |
01-08-2024 |
30-11-2024 |
3
|
4. |
ETD 20 : WG05 |
Standards on Electrical Installations Prosumer Locations
a. Conduct an extensive study and comparative analysis of existing literature, research papers, international standards, and any other published information.
b. Evaluate the level of manufacturing bases in the country to understand the capabilities and quality of production facilities.
c. Assess the testing infrastructure in the country to determine the availability and adequacy of facilities for conducting product testing and quality assurance.
d. Identifying the potential advantages, limitations, and challenges associated with implementing Prosumer installations in various sectors such as residential, commercial, and industrial and propose draft requirements to be included in the new standard. |
04-01-2025 |
31-05-2025 |
2
|
5. |
ETD 20 : WG06 |
Revision of IS 5216 : Part 1 and Part 2: Recommendations on safety procedures and practices in electrical work
a. Conduct an extensive study and comparative analysis of existing literature, research papers, international standards, and any other published information .
b. Identifying the potential advantages, limitations, and challenges associated with implementing safety procedures and practices in electrical work in various sectors such as residential, commercial, and industrial and propose draft requirements to be included in the revision of IS 5216. |
15-11-2024 |
21-05-2025 |
2
|
6. |
ETD 20 : WG07 |
IS 8884 : 1978 Code of practice for the installation of electric bells and call system
a. Conduct an extensive study and comparative analysis of existing literature, research papers, international standards, and any other published information.
b. Evaluate the level of manufacturing bases in the country to understand the capabilities and quality of production facilities.
c. Assess the testing infrastructure in the country to determine the availability and adequacy of facilities for conducting product testing and quality assurance.
d. Identifying the potential advantages, limitations, and challenges associated with implementing installation of electric bells and call system in various sectors such as residential, commercial, and industrial and propose draft requirements to be included in the revision of IS 8884. |
01-12-2024 |
01-06-2025 |
4
|
7. |
ETD 20 : WG08 |
IS 7689 : 1989 Guide for control of undesirable static electricity
a. Conduct an extensive study and comparative analysis of existing literature, research papers, international standards, and any other published information.
b. Evaluate the level of manufacturing bases in the country to understand the capabilities and quality of production facilities.
c. Assess the testing infrastructure in the country to determine the availability and adequacy of facilities for conducting product testing and quality assurance. |
01-12-2024 |
31-07-2025 |
2
|