S No Group Number Task Date of creation Time Frame No of Members
1. ETD 19 : WG01 Revision of IS/IEC/TS 61936-2 : 2015 Power installations exceeding 1 kV ac and 15 kV dc Part 2: dc a. Conduct an extensive study and comparative analysis of existing literature, research papers, international standards, and any other published information . b. Evaluate the level of manufacturing bases in the country to understand the capabilities and quality of production facilities. c. Assess the testing infrastructure in the country to determine the availability and adequacy of facilities for conducting product testing and quality assurance. d. Identifying the potential advantages, limitations, and challenges associated with implementing Earthing systems in various sectors such as residential, commercial, and industrial and propose draft requirements to be included in the revision 09-07-2024 09-11-2024 3
2. ETD 19 : WG02 Standard on “ Power installations exceeding 1 kV AC and 1,5 kV DC - Part 0: Principles to be observed in the design and erection of high voltage installations - Safety of high voltage installations ” a. Conduct an extensive study and comparative analysis of existing literature, research papers, international standards, and any other published information . b. Evaluate the level of manufacturing bases in the country to understand the capabilities and quality of production facilities. c. Assess the testing infrastructure in the country to determine the availability and adequacy of facilities for conducting product testing and quality assurance. 01-08-2024 01-12-2024 3