S No Group Number Task Date of creation Time Frame No of Members
1. CED 56 : WG01 Construction of RCC crib walls 02-09-2024 02-09-2024 4
2. CED 56 : WG02 Design of RCC cantilever wall/buttressed walls/L-Type walls 02-09-2024 02-09-2024 3
3. CED 56 : WG03 Design and construction of reinforced earth retaining walls and slopes 11-10-2024 11-10-2024 4
4. CED 56 : WG04 New Indian Standard on Bio-Technical Measures for Improving the Stability of Slope 11-10-2024 11-10-2024 5
5. CED 56 : WG05 New Indian Standard on ‘Monitoring of Landslides’ 11-10-2024 11-10-2024 3
6. CED 56 : WG06 New Indian Standard on ‘Open Excavation and Hill Slope Stability’ 11-10-2024 11-10-2024 6
7. CED 56 : WG07 New Indian Standard on ‘Guidelines for Disposal of Blasted Muck in Hilly Areas’ 11-10-2024 11-10-2024 6