S No Group Number Task Date of creation Time Frame No of Members
1. CED 53 : WG01 To prepare new standard on Precast Concrete, Box Culverts and U Drains, Precast Concrete Boundary Walls, and Circular Precast Inspection Chamber 19-08-2024 19-08-2024 2
2. CED 53 : WG02 For the revision of IS 2185 (Part 1 to 4) Concrete Masonry Units - Specifications Part 1 Hollow and solid concrete blocks (third revision) Part 2 Hollow and solid lightweight concrete blocks (first revision) (superseding IS 3590) Part 3 Autoclaved cellular (Aerated) concrete blocks (first revision) (Superseding IS 5482) Part 4 Cellular preformed foam concrete blocks 19-08-2024 19-08-2026 2