S No Group Number Task Date of creation Time Frame No of Members
1. CED 03 : P2 : WG1 Preparing The Draft For Stainless Steel Water Storage Tanks, CED 03: P2/WG1 16-10-2024 16-04-2025 2
2. CED 03 : P3 : WG1 Preparing The Draft for CED 03: P3/WG1 Draft for Grease Separators, 16-10-2024 16-04-2025 2
3. CED 03 : P5 : WG1 Preparing The Draft for CED 03: P5/ WG03-Working Group for Revision of IS 3042, 16-10-2024 16-04-2025 2
4. CED 03 : WG01 - - 2
5. CED 03 : WG01 - - 2
6. CED 03 : WG01 - - 2
7. CED 03 : P2 : WG2 Revision of IS 13983 11-02-2025 31-12-2025 2
8. CED 03 : P5 : WG2 Preparing The Draft for CED 03: P5 /WG02-Working Group for Revision of IS 14845 and IS 14846, CED 3:5/WG2 Working Group 16-10-2024 16-04-2025 3
9. CED 03 : P1 : WG2 Preparing The Draft for CED 03: P1/WG 2 -Working Group for Revision of IS 1726, 16-10-2024 16-04-2025 3
10. CED 03 : WG02 - - 3
11. CED 03 : WG02 - - 3
12. CED 03 : P1 : WG3 Preparing The Draft for CED 03: P1/ WG03-Working Group for Revision of IS 12701, 16-10-2024 16-04-2025 4
13. CED 03 : P5 : WG3 Preparing The Draft for CED 03: P5/ WG03-Working Group for Revision of IS 3042, 16-10-2024 16-04-2025 2
14. CED 03 : WG03 - - 2
15. CED 03 : WG03 - - 4
16. CED 03 : P1 : WG4 Preparing The Draft for CED 03: P1/ WG04-WG for IS for FRP Manhole Cover and Frames, Gratings and Steps for Manholes, 16-10-2024 16-04-2025 2
17. CED 03 : WG04 - - 2
18. CED 03 : P1 : WG5 Preparing The Draft for CED 03: P1/WG05-WG for IS for Ductile Iron Manhole Cover and Frames, Gratings and Steps for Manholes, CED 3:1/WG 5 Working Group 16-10-2024 16-04-2025 3
19. CED 03 : WG05 - - 3