S No Group Number Task Date of creation Time Frame No of Members
1. PGD 25 : WG02 The Scope of the working group to finalized the P-draft of Video Measuring System Panel. 02-07-2024 31-03-2025 4
2. PGD 25 : WG03 The scope of the Working group to finalized the P-draft of Gauge Block calibrator Panel. 02-07-2024 31-03-2025 4
3. PGD 25 : WG04 The Scope of the working group to finalized the P-draft of Universal length Machine. 02-07-2024 31-03-2025 6
4. PGD 25 : WG05 1.Preparation of the working draft in respect of the revision of IS 335:2018 within 3 months. 2.Examine and provide technical inputs on all the comments and queries received on IS 335:2018 to the committee. 16-05-2024 16-08-2024 3