S No | Group Number | Scope of work | Date of creation | Time Frame | No of Members |
---|---|---|---|---|---|
1. | TED 04 : P1 | Foundation treatment for barrages on gravelly and boundary reaches. Preparation of a draft document based on the existing literature and expertise so that the draft can be used as a Preliminary draft for formulation of a new standard. | 17-10-2024 | 17-10-2024 | 3 |
2. | TED 04 : P2 | - | - | 4 |