S No Group Number Scope of work Date of creation Time Frame No of Members
1. FAD 32 : P1 Revision of IS 6066: 1994 Pressure Grouting of Rock Foundations in River Valley Projects – Recommendations. Preparation of a draft document based on the existing standard so that the draft can be used as a Preliminary draft for formulation of a new standard. 17-10-2024 17-10-2024 4
2. FAD 32 : P2 Improving Water Use Efficiency 02-10-2024 30-11-2024 4
3. FAD 32 : P3 Piped Irrigation Network 03-10-2024 16-01-2025 11
4. FAD 32 : P4 Criteria for Structural Design of Penstocks Part 2 Buried/ Embedded Penstocks in Rocks {First Revision of S 11639 Part 2} 05-10-2024 09-01-2025 8
5. FAD 32 : P5 The Committee Noted and deliberated on the comments received CWPRS. The Committee decided to circulate the documents as a P-draft among the member after incorporating all the comments received from CWPRS. The Committee further decided to constitute a Working group (WG-8) to review the P-draft after circulation. The Composition of the WG-8 is placed in Annex A. 21-10-2024 21-10-2026 8