S No Group Number Scope of work Date of creation Time Frame No of Members
1. SSD 12 : P6 Revision of IS/IEC 61400-2 Wind turbines - Part 2: Small wind turbines a. Conduct an extensive study and comparative analysis of existing literature, research papers, international standards, and any other published information . b. Evaluate the level of manufacturing bases in the country to understand the capabilities and quality of production facilities. c. Assess the testing infrastructure in the country to determine the availability and adequacy of facilities for conducting product testing and quality assurance. d. Identifying the potential advantages, limitations, and challenges associated with implementing Earthing systems in various sectors such as residential, commercial, and industrial and propose draft requirements to be included in the revision 28-07-2024 28-11-2024 7
2. SSD 12 : P7 WRD 16 : WG-01 Guidelines for Performance, Monitoring, and Surveillance of Hydraulic Structures based on existing guidelines, standards and other literature. The Group may also take help from the outcome of the R&D Project being taken up. So that the draft can be used as a Preliminary draft for formulation of a new standard. 17-10-2024 17-10-2024 9
3. SSD 12 : P8 To review work of ISO/TC 295 'Audit Data Services' and its working groups. 04-11-2024 25-12-2026 8