S No Group Number Scope of work Date of creation Time Frame No of Members
1. ETD 47 : P1 Systematic drafting of NWIPs under the scope of the panel 18-12-2024 18-12-2024 7
2. ETD 47 : P2 Systematic drafting of NWIPs under the scope of the panel 18-12-2024 18-12-2024 6
3. ETD 47 : P3 Systematic drafting of NWIPs under the scope of the panel 18-12-2024 18-12-2024 7