1. |
TED 29 : P1 |
The committee decided to create the following Working Group, WG 1, for Revision of the draft LITD/09/24957 (Identical To IEC 61000-5-2:1997) Electromagnetic Compatibility EMC Part 5: Installation and Mitigation Guidelines Section 2: Earthing and Cabling. The WG would discuss the comments received on the document and revise the draft |
13-12-2024 |
27-12-2024 |
5
|
2. |
TED 29 : P2 |
For revision of IS 6873 (Part 4): 2019 Limits and Methods of Measurement of Radio Disturbance Characteristics Part 4 Industrial Scientific and Medical Radio-Frequency Equipment Second Revision. The WG would discuss the document in view of the revised CISPR 11:2024 and also analyse the standard in terms of the Indian ecosystem |
13-12-2024 |
27-12-2024 |
6
|
3. |
TED 29 : P3 |
for review and confirm suitability regarding the adoption of CISPR 16-1-2:2014+AMD1:2017 CSV Specification for radio disturbance and immunity measuring apparatus and methods - Part 1-2: Radio disturbance
and immunity measuring apparatus - Coupling devices for conducted disturbance measurement. |
13-12-2024 |
27-12-2024 |
7
|