S No Group Number Scope of work Date of creation Time Frame No of Members
1. FAD 05 : P10 - - 12
2. FAD 05 : P11 - - 9
3. FAD 05 : P13 The scope of this working group is to prepare a P- draft on Wind Cone Assembly (Windsocks). 29-08-2024 31-03-2025 7
4. FAD 05 : P14 - - 6