S No Group Number Scope of work Date of creation Time Frame No of Members
1. ETD 02 : P3 To revise IS 1545 and IS 2501 17-12-2024 17-12-2024 4
2. ETD 02 : P4 Review and prepare draft revision of IS 5573 : 1984 13-09-2024 31-03-2025 6
3. ETD 02 : P5 Prepare working drafts on the specification of 2,4-Di TBP, 2,6-Di TBP, 0-TBP and p-TBP 14-07-2024 14-06-2025 5
4. ETD 02 : P6 for revision of IS 15652 : 2006 29-08-2022 29-08-2022 4
5. ETD 02 : P7 Formulation Indian Standards on Heat Shrinkable Sleeve Testing 29-08-2022 29-08-2022 4