S No Group Number Scope of work Date of creation Time Frame No of Members
1. ETD 01 : P1 Systematic drafting of NWIPs under the scope of the panel and review under the scope of the panel 20-01-2025 20-01-2025 25
2. ETD 01 : P2 Systematic drafting of NWIPs under the scope of the panel and review under the scope of the panel 20-01-2025 20-01-2025 10