S No Group Number Task Date of creation Time Frame No of Members
1. PGD C : WG01 - - 0
2. PGD 04 : WG01 The working group will focus on the development, standardization, and performance evaluation of punches used in pressing operations across various industries. This includes defining material specifications, design parameters, durability standards, and compatibility requirements for punches used in forming, cutting, and shaping metal or other materials. The group will also establish guidelines for testing wear resistance, precision, and operational efficiency under various load and environmental conditions. Safety, maintenance protocols, and best practices for optimizing tool life will be prioritized to ensure consistent, high-quality production outcomes and workplace safety. 15-05-2024 15-05-2026 0
3. PGD 15 : WG01 Formulation of standards pertaining to “Review of pre 2000 Standards-2” 01-01-2024 01-01-2029 4
4. PGD 18 : WG01 Development of Indian Standards for Nuclear Digital Ecosystem Framework in coordination with ISO/TC 184/SC 4/WG 3 project numbered ISO 18136 12-06-2023 13-04-2025 1
5. PGD 21 : WG01 The scope of this working group is to review and prepare draft of the standards related to Pyranometer and Pyrheliometer. 29-08-2024 28-02-2025 3
6. PGD 21 : WG02 The scope of this working group is to prepare a P- draft on Wind Cone Assembly (Windsocks). 29-08-2024 31-03-2025 2
7. PGD 23 : WG01 Formulation of standard for requirements and testing of ion coating of watch cases by physical vapour deposition. 30-09-2024 29-11-2024 0
8. PGD 23 : WG02 Revision of IS 15449 (Parts 1 to 4) 'Household zig-zag Sewing Machine Head' 14-03-2023 31-12-2024 0
9. PGD 23 : WG03 Formulation of standard on clocks used in automobiles 30-09-2024 28-02-2025 0
10. PGD 23 : WG04 Formulation of standard on test method for evaluating the accuracy of quartz watches 30-09-2024 28-02-2025 0
11. PGD 24 : WG01 Review SP 46 and propose the revised scope and structure of the revision document including addition of new subject areas. 30-09-2024 30-01-2025 0
12. PGD 24 : WG02 Review ISO 81346 series on RDS and give a report on relevance in Indian context and identify subject experts on RDS. Deliverable: a) Report b) Recommended level of interest for ISO projects on Reference Designation Systems 30-09-2024 30-09-2024 0
13. PGD 25 : WG02 The Scope of the working group to finalized the P-draft of Video Measuring System Panel. 02-07-2024 31-03-2025 4
14. PGD 25 : WG03 The scope of the Working group to finalized the P-draft of Gauge Block calibrator Panel. 02-07-2024 31-03-2025 4
15. PGD 25 : WG04 The Scope of the working group to finalized the P-draft of Universal length Machine. 02-07-2024 31-03-2025 6
16. PGD 28 : WG01 Preparation of draft Indian Standards for Pistols/Revolvers. 21-06-2024 05-06-2026 4
17. PGD 34 : WG01 This working group will focus on the design, functionality, and safety standards for combination side cutting pliers used in various electrical, mechanical, and industrial applications. The group will define material requirements, ergonomic considerations, cutting edge durability, and handle insulation for electrical safety. Additionally, it will establish performance benchmarks for cutting efficiency across different wire gauges and hardness levels. Testing methodologies for wear, force requirements, and long-term reliability will be developed, along with guidelines to ensure compliance with industry standards. The group will also address user safety, including slip resistance and hand fatigue during prolonged use. 15-05-2024 15-05-2026 0
18. PGD 34 : WG02 The working group will focus on the development, testing, and standardization of non-sparking tools designed for use in hazardous environments where flammable gases, vapors, or dusts are present. The group will define material compositions, such as copper alloys, aluminum-bronze, or beryllium-copper, that ensure tools do not produce sparks during use. Performance standards will be established for durability, corrosion resistance, and mechanical strength. Additionally, the group will develop testing protocols for verifying spark resistance, as well as guidelines for safe use, maintenance, and inspection of non-sparking tools to prevent accidents in explosive or flammable atmospheres. 15-05-2024 15-05-2026 0
19. PGD 34 : WG03 Covers the dimensions and other requirements for heavy duty pipe wrenches. 22-10-2024 22-10-2025 7
20. PGD 34 : WG04 This Indian standard covers the requirements for forged open jaw (ended) wrenches (spanners) of torque series C and D 22-10-2024 22-11-2025 7
21. PGD 34 : WG05 This draft Indian standard covers the requirements of forged, double-ended ring wrenches (spanners) of cranked, straight, angled and offset types conforming to torque series A and B 22-10-2024 22-11-2025 7
22. PGD 35 : WG01 - - 0
23. PGD 37 : WG01 Standards on Hexagon Head Bolts, Nuts and Screws 16-10-2024 12-10-2023 0
24. PGD 37 : WG02 Self Tapping and Self Drilling Screws 16-10-2024 27-08-2024 0
25. PGD 38 : WG01 Revision of IS 10325 : 2000 ‘Square tins — 15 kg/litre for ghee, vanaspati, edible oils and bakery shortenings — Specification (second revision)’ 09-09-2024 09-11-2024 4
26. PGD 38 : WG02 Revision of IS 1554-1&2, IS 7098-1 06-03-2023 22-10-2024 0
27. PGD 38 : WG03 revision of IS 13573-2, new standard as IS 13573-4 and testing of Aerial bunched cables accessories 06-03-2023 12-12-2024 0
28. PGD 38 : WG04 new standard as IS 1255-2 16-05-2024 22-10-2024 0
29. PGD 38 : WG05 Prepare a working draft on ‘Easy open ends’ 09-09-2024 10-02-2025 0
30. PGD 38 : WG06 Review of the standards on aerosol containers 09-09-2024 10-01-2025 0
31. PGD 39 : WG01 Standarisation on Preparation of drawings for Optical elements and systems 16-10-2024 16-10-2024 0