1. |
PCD 01 : 2 : P1 |
Working group for addressing Sustainability in the field of manufacturing of Aluminium Ingots |
23-10-2024 |
23-10-2024 |
5
|
2. |
PCD 01 : 1 : P1 |
Working Group for Detection and Avoidance Systems |
04-04-2024 |
31-03-2025 |
8
|
3. |
PCD 01 : 3 : P1 |
Revision of IS/ISO 30406,30409,30408 |
04-04-2024 |
01-10-2024 |
5
|
4. |
PCD 01 : P2 |
Review of IS 1448 (Part 175): 2020 - Methods of test for petroleum and its products Part 175 petroleum products - Determination of water - Potentiometric karl fischer titration method. |
30-10-2024 |
30-04-2025 |
11
|
5. |
PCD 01 : 1 : P3 |
Active Safety |
20-11-2024 |
20-11-2025 |
8
|
6. |
PCD 03 : 1 : P4 |
Review of IS 6241: 2024 Determination of Stripping value of road aggregates— Methods of Tests |
15-10-2024 |
15-04-2025 |
17
|
7. |
PCD 03 : 1 : P1 |
This working group will focus on the design, functionality, and safety standards for combination side cutting pliers used in various electrical, mechanical, and industrial applications. The group will define material requirements, ergonomic considerations, cutting edge durability, and handle insulation for electrical safety. Additionally, it will establish performance benchmarks for cutting efficiency across different wire gauges and hardness levels. Testing methodologies for wear, force requirements, and long-term reliability will be developed, along with guidelines to ensure compliance with industry standards. The group will also address user safety, including slip resistance and hand fatigue during prolonged use. |
15-05-2024 |
15-05-2026 |
14
|
8. |
PCD 03 : 1 : P2 |
The working group will focus on the development, testing, and standardization of non-sparking tools designed for use in hazardous environments where flammable gases, vapors, or dusts are present. The group will define material compositions, such as copper alloys, aluminum-bronze, or beryllium-copper, that ensure tools do not produce sparks during use. Performance standards will be established for durability, corrosion resistance, and mechanical strength. Additionally, the group will develop testing protocols for verifying spark resistance, as well as guidelines for safe use, maintenance, and inspection of non-sparking tools to prevent accidents in explosive or flammable atmospheres. |
15-05-2024 |
15-05-2026 |
10
|
9. |
PCD 03 : 2 : P1 |
Formulation of standard on test method for evaluating the accuracy of quartz watches |
30-09-2024 |
28-02-2025 |
2
|
10. |
PCD 03 : 1 : P5 |
Formulation of standard on Quality of Measurement |
12-07-2024 |
30-01-2025 |
10
|
11. |
PCD 03 : 1 : P6 |
The scope of work for architecture in the context of Intelligent Transport Systems (ITS) involves the design and development of systems, structures, and frameworks that support the integration of technology into transportation networks. This includes creating architectural models that define the components, data flows, and interactions between various ITS elements, such as traffic management systems, vehicle communication technologies, and user interfaces. |
28-10-2024 |
28-10-2024 |
21
|
12. |
PCD 03 : 1 : P7 |
Revision of IS 5517:1993 Steel for hardening and tempering |
14-11-2024 |
14-07-2025 |
11
|
13. |
PCD 03 : P8 |
|
- |
- |
4
|
14. |
PCD 06 : P1 |
Emergency |
22-10-2024 |
31-03-2025 |
5
|
15. |
PCD 06 : P2 |
Enforcement |
22-10-2024 |
31-03-2025 |
4
|
16. |
PCD 06 : P3 |
To review work of IS Standards which are pending for review |
09-04-2024 |
09-07-2024 |
6
|
17. |
PCD 06 : P4 |
To review IS Standards |
16-04-2024 |
26-09-2024 |
5
|
18. |
PCD 07 : P1 |
|
- |
- |
5
|
19. |
PCD 07 : P6 |
|
- |
- |
3
|
20. |
PCD 07 : P7 |
|
- |
- |
1
|
21. |
PCD 07 : P8 |
|
- |
- |
2
|
22. |
PCD 07 : P9 |
|
- |
- |
2
|
23. |
PCD 07 : P12 |
To revise the provision of Part 9 / section 1 under NBC regarding WG for Water Supply members |
10-09-2024 |
20-12-2023 |
2
|
24. |
PCD 07 : P13 |
To revise the provision of Part 9 / section 2 under NBC regarding WG for Drainage and Sanitation |
10-09-2024 |
20-12-2023 |
3
|
25. |
PCD 07 : P2 |
To revise the provision of Part 9 / section 3 under NBC regarding WG for Solid Waste Management |
10-09-2024 |
20-12-2023 |
5
|
26. |
PCD 07 : P3 |
To review and provide the recommendations on the comments received on IS 16738. |
29-08-2024 |
30-11-2024 |
6
|
27. |
PCD 07 : P5 |
To provide a working draft on recycled PET in food packaging. |
29-08-2024 |
30-10-2024 |
8
|
28. |
PCD 07 : P10 |
To prepare/provide
a) To prepare terms of reference (ToR) for round robin test/ Inter-lab comparison study on IS I 7899T : 2024 and suggest next course of action.
b) To review the proposal received from MoEF&CC for colour coding of biodegradable and compostable plastic and provide feed back. |
29-08-2024 |
30-11-2024 |
13
|
29. |
PCD 07 : 6 : P4 |
Road Infrastructure analysis |
20-11-2024 |
20-11-2025 |
5
|
30. |
PCD 09 : P1 |
STandardization in the field of Ksharasutra cabinet and test methods |
10-01-2024 |
31-12-2025 |
4
|
31. |
PCD 09 : P5 |
Semi-hermetic compressor |
13-10-2024 |
01-01-2028 |
5
|
32. |
PCD 09 : P6 |
|
- |
- |
3
|
33. |
PCD 09 : P7 |
|
- |
- |
3
|
34. |
PCD 09 : P8 |
|
- |
- |
3
|
35. |
PCD 12 : P3 |
Revision of IS 14580 |
22-10-2024 |
29-03-2025 |
5
|
36. |
PCD 12 : P4 |
Post Project |
22-10-2024 |
20-01-2025 |
4
|
37. |
PCD 12 : P5 |
Formulation of Standard on sustainable Human Resource Management |
22-10-2024 |
20-01-2025 |
4
|
38. |
PCD 12 : P6 |
This working group has been created to revise IS 10773 : 1995 |
17-07-2023 |
31-03-2025 |
5
|
39. |
PCD 12 : P7 |
Development of Indian Standard on AI Based Automatic Grain Analyzer |
23-10-2024 |
01-10-2025 |
4
|
40. |
PCD 12 : P8 |
Working group for Aerospace Components |
24-09-2024 |
31-03-2025 |
5
|
41. |
PCD 12 : P9 |
Working group for Aerospace Fastener Systems |
24-09-2024 |
31-03-2025 |
5
|
42. |
PCD 12 : P10 |
Working group for Air Cargo |
24-09-2024 |
31-03-2025 |
2
|
43. |
PCD 12 : P11 |
Working Group for Design Engineering and Production System Requirements Validation |
24-09-2024 |
31-03-2025 |
3
|
44. |
PCD 12 : P12 |
Working group for Space Operations |
24-09-2024 |
31-03-2025 |
6
|
45. |
PCD 12 : P13 |
Working group for Space Environment |
24-09-2024 |
31-03-2025 |
3
|
46. |
PCD 12 : P14 |
Working group for Space System Programme |
24-09-2024 |
31-03-2025 |
10
|
47. |
PCD 12 : P15 |
Working group for Space Systems Programme Management and Quality |
24-09-2024 |
31-03-2025 |
3
|
48. |
PCD 12 : P16 |
Working group for Space Material and Process |
24-09-2024 |
31-03-2025 |
8
|
49. |
PCD 12 : P17 |
Working group for Space Orbital Debris |
24-09-2024 |
31-03-2025 |
6
|
50. |
PCD 12 : P18 |
Working group for Downstream Space Services |
24-09-2024 |
31-03-2025 |
4
|
51. |
PCD 12 : P19 |
Working Group of Frames |
03-10-2024 |
31-03-2025 |
3
|
52. |
PCD 12 : P20 |
Working for Handle Bar |
03-10-2024 |
31-03-2025 |
4
|
53. |
PCD 12 : P21 |
Working group for Handle Bar |
03-10-2024 |
31-03-2025 |
3
|
54. |
PCD 18 : P2 |
PREPARATION OF DRAFT FOR SOLAR PVs |
02-09-2024 |
31-08-2026 |
10
|
55. |
PCD 19 : P3 |
To revise the provision of Part 9 / section 4 under NBC regarding WG for Gas Supply |
10-09-2024 |
20-12-2023 |
23
|
56. |
PCD 19 : P4 |
To conclude the comments received on P-Draft and working group requested to submit recommendations to BIS. |
11-09-2024 |
11-03-2025 |
26
|
57. |
PCD 19 : P1 |
Raw materials and GRAS List |
03-10-2024 |
03-10-2026 |
19
|
58. |
PCD 19 : P7 |
Hair Care Products |
14-10-2024 |
14-12-2026 |
18
|
59. |
PCD 21 : P1 |
To study and prepare report on floating solar PV plant standardization and prepare working drafts for the Floatovolatic systems. |
04-04-2024 |
04-11-2024 |
4
|
60. |
PCD 21 : P2 |
|
- |
- |
6
|
61. |
PCD 21 : P3 |
|
- |
- |
6
|
62. |
PCD 21 : P4 |
For reviewing comments on IS 17882:2022 |
15-05-2024 |
10-06-2024 |
5
|
63. |
PCD 21 : P5 |
|
- |
- |
6
|
64. |
PCD 21 : P6 |
|
- |
- |
4
|
65. |
PCD 21 : P7 |
|
- |
- |
7
|
66. |
PCD 21 : P8 |
|
- |
- |
4
|
67. |
PCD 25 : P1 |
3D Bioprinting |
06-06-2024 |
01-03-2025 |
10
|
68. |
PCD 25 : 1 : P1 |
Guidelines to provide the information services to Researchers |
25-10-2024 |
31-10-2025 |
7
|
69. |
PCD 25 : 1 : P3 |
Review of ISO Standards |
25-10-2024 |
31-10-2025 |
10
|
70. |
PCD 25 : 1 : P4 |
This working group has been created to revise IS 5897 : 1985. |
06-09-2024 |
31-03-2025 |
16
|
71. |
PCD 25 : P5 |
The scope of work for the mechanical aspects of reciprocating internal combustion engine-driven generating sets focuses on ensuring the reliability, durability, and optimal performance of mechanical components. This includes evaluating engine mounting, alignment, vibration isolation, cooling systems, lubrication, and exhaust systems. Mechanical assessments cover structural integrity, thermal management, and wear resistance to reduce downtime and enhance efficiency. Maintenance schedules, inspections, and testing protocols are established to monitor component health, ensuring that the generating set operates smoothly under varying loads and conditions while complying with safety and industry standards. |
28-10-2024 |
28-10-2024 |
7
|
72. |
PCD 25 : 2 : P1 |
The scope of sensor data interfaces for automated driving functions involves developing standardized methods for collecting, processing, and sharing data from various vehicle sensors, such as cameras, LiDAR, radar, and ultrasonic sensors. |
28-10-2024 |
28-10-2024 |
4
|
73. |
PCD 25 : 1 : P2 |
Revision of SP 72: National Lighting Code, Part 5 Interior Illumination in relation to the requirements outlined in the revised draft of IS 3646 |
28-10-2024 |
31-12-2024 |
12
|
74. |
PCD 25 : 3 : P1 |
Injection equipment plays a crucial role in the propulsion and powertrain systems of vehicles, particularly in internal combustion engines (ICEs) and increasingly in hybrid and electric systems. |
28-10-2024 |
28-10-2024 |
10
|
75. |
PCD 25 : P8 |
Revision to merge IS 15997 and IS 5522 into IS 5522 |
21-11-2024 |
21-03-2025 |
6
|
76. |
PCD 25 : P9 |
|
- |
- |
5
|
77. |
PCD 27 : P1 |
formulation of standard on Data Ethics |
12-07-2024 |
30-01-2025 |
5
|
78. |
PCD 27 : P2 |
Revision of Terotechnology Standard IS 15363 |
22-10-2024 |
22-02-2025 |
7
|
79. |
PCD 27 : P3 |
Glossary of Term |
22-10-2024 |
22-10-2024 |
5
|
80. |
PCD 27 : P4 |
|
- |
- |
4
|