1. |
ETD 02 : P3 |
|
- |
- |
4
|
2. |
ETD 02 : P4 |
|
- |
- |
6
|
3. |
ETD 02 : P5 |
|
- |
- |
5
|
4. |
ETD 02 : P6 |
for revision of IS 15652 : 2006 |
29-08-2022 |
29-08-2022 |
4
|
5. |
ETD 02 : P7 |
Formulation Indian Standards on Heat Shrinkable Sleeve Testing |
29-08-2022 |
29-08-2022 |
4
|
6. |
ETD 03 : P3 |
1.Preparation of the working draft in respect of the revision of IS 335:2018 within 3 months.
2.Examine and provide technical inputs on all the comments and queries received on IS 335:2018 to the committee. |
16-05-2024 |
16-08-2024 |
9
|
7. |
ETD 07 : P1 |
The scope of work of the Panel is to conduct a comprehensive review and detailed analysis of ballot documents and standards issued by IEC TC 121 (Low-voltage switchgear and controlgear assemblies) and its Subcommittee SC 121A (Low-voltage switchgear and controlgear). The Panel aims to ensure the technical accuracy, relevance, and alignment of these documents with national requirements and industry practices, while representing the national viewpoint effectively in the international standardization process.
To ensure that the national viewpoint is adequately represented and that technical content aligns with the interests and requirements of stakeholders. |
01-09-2024 |
01-09-2024 |
6
|
8. |
ETD 07 : P2 |
The scope of work of the Panel is to conduct a comprehensive review and detailed analysis of ballot documents and standards issued by IEC SC 121B (Low-voltage switchgear and controlgear assemblies). The Panel aims to ensure the technical accuracy, relevance, and alignment of these documents with national requirements and industry practices, while representing the national viewpoint effectively in the international standardization process. |
01-09-2024 |
01-09-2024 |
6
|
9. |
ETD 07 : P3 |
The scope of work of the Panel is to conduct a comprehensive review and detailed analysis of ballot documents and standards issued by IEC SC 23E (Circuit-breakers and similar equipment for household use). The Panel aims to ensure the technical accuracy, relevance, and alignment of these documents with national requirements and industry practices, while representing the national viewpoint effectively in the international standardization process. |
01-09-2024 |
01-09-2024 |
5
|
10. |
ETD 08 : P1 |
Preparation of new standard on Code of Practice for On-site Diagnostic Tests and Condition Monitoring of High Voltage Substation Equipment |
26-08-2024 |
31-12-2024 |
8
|
11. |
ETD 08 : P2 |
Review of standards related to common Specifications for High-voltage switchgear and control gear |
03-12-2024 |
01-05-2025 |
0
|
12. |
ETD 09 : P12 |
Low Voltage cables upto 1100 V and test methods |
28-10-2024 |
27-10-2026 |
10
|
13. |
ETD 09 : P13 |
High voltage cables above 1100V and test methods |
28-10-2024 |
27-10-2026 |
10
|
14. |
ETD 09 : P14 |
cable accessories and test methods |
28-10-2024 |
28-10-2026 |
7
|
15. |
ETD 11 : P3 |
To prepare Preliminary Drafts (P-draft) on Potentization process, devices and machines used in homoeopathy. The WG may also examine and resolve the comments received on these Drafts. |
12-06-2023 |
31-12-2025 |
6
|
16. |
ETD 13 : P4 |
Maintenance of IS 16444 (Parts 1 and 2), drafting of amendments and communication technology |
08-05-2019 |
20-08-2025 |
21
|
17. |
ETD 13 : P2 |
Maintenance of IS 13779, IS 14697 and IS 15884 |
08-05-2019 |
20-08-2025 |
16
|
18. |
ETD 13 : P1 |
Maintenance of IS 15959 series of standards |
08-05-2019 |
20-09-2025 |
22
|
19. |
ETD 13 : P5 |
Revision of IS 8923:1978 Warning symbol for dangerous voltages and Revision of: IS 2551:1982 Danger Notice Plates
a. Conduct an extensive study and comparative analysis of existing literature, research papers, international standards, and any other published information .
b. Evaluate the level of manufacturing bases in the country to understand the capabilities and quality of production facilities.
c. Assess the testing infrastructure in the country to determine the availability and adequacy of facilities for conducting product testing and quality assurance. |
01-08-2024 |
30-11-2024 |
9
|
20. |
ETD 14 : P2 |
i. Preparation of working draft for 25A rating plugs and sockets outlet under IS 1293:2019
ii. Preparation of working draft for New standards on Plugs and sockets outlets
ii. Review/Revision of existing existing standards on the subject |
23-06-2024 |
31-03-2025 |
5
|
21. |
ETD 16 : P10 |
Transition of Security Mechanism in IS 15959 series of standards |
30-09-2019 |
20-08-2025 |
13
|
22. |
ETD 16 : P1 |
|
- |
- |
14
|
23. |
ETD 16 : P4 |
|
- |
- |
9
|
24. |
ETD 16 : P5 |
|
- |
- |
5
|
25. |
ETD 16 : P7 |
|
- |
- |
10
|
26. |
ETD 16 : P9 |
|
- |
- |
8
|
27. |
ETD 16 : P11 |
|
- |
- |
7
|
28. |
ETD 16 : P12 |
|
- |
- |
6
|
29. |
ETD 16 : P14 |
Standardization for the Packs used in Naturopathy Therapy |
20-07-2023 |
31-12-2025 |
7
|
30. |
ETD 16 : P13 |
Refractory Test Piece Preparation via Gunning Techniques and for looking after documents prepared by ISO WG 25. |
15-09-2024 |
08-10-2024 |
5
|
31. |
ETD 16 : P6 |
Working Group on Housing in Coastal areas |
16-10-2024 |
16-10-2024 |
7
|
32. |
ETD 18 : P1 |
To review the documents and Indian standards on Temperature Measurement under ETD 18, Industrial Process Measurement and control Sectional Committee. |
23-06-2024 |
31-03-2025 |
3
|
33. |
ETD 18 : P2 |
To review the documents and Indian standards on Electric Furnaces under ETD 18, Industrial Process Measurement and control Sectional Committee. |
23-06-2024 |
31-03-2025 |
2
|
34. |
ETD 20 : P1 |
Revision of Standard on Earthing, IS 3043
a. Conduct an extensive study and comparative analysis of existing literature, research papers, international standards, and any other published information related to Earthing.
b. Evaluate the level of manufacturing bases in the country to understand the capabilities and quality of production facilities.
c. Assess the testing infrastructure in the country to determine the availability and adequacy of facilities for conducting product testing and quality assurance.
d. Identifying the potential advantages, limitations, and challenges associated with implementing Earthing systems in various sectors such as residential, commercial, and industrial and propose draft requirements to be included in the revision of IS 3043. |
18-06-2024 |
18-02-2025 |
9
|
35. |
ETD 22 : P1 |
Review/Revision of IS 4051, IS 9559 , IS 2772 and IS 11333. |
01-09-2024 |
01-09-2024 |
9
|
36. |
ETD 23 : P3 |
To review and revise the following Indian Standards related to LED:
a) IS 16102 (Part 1 & Part 2): Self - Ballasted led lamps for general lighting services- Safety and Performance
b) IS 16103 (Part 1 & Part 2): Led modules for general lighting: safety and performance
c) IS 16614 (Part 1 & Part 2): Double-Capped LED Linear Lamps : safety and performance |
10-02-2023 |
- |
6
|
37. |
ETD 25 : P4 |
To prepare new and revision documents of IS 17900 series on Lifts for transport of persons and goods and resolve any queries/provide inputs. Working drafts of other new subjects shall also be prepared by the panel for further discussion in the sectional committee. |
18-03-2021 |
15-10-2025 |
19
|
38. |
ETD 32 : P3 |
Revision of IS 2082 Stationery storage type electric water heaters |
25-06-2024 |
15-11-2024 |
9
|
39. |
ETD 34 : P1 |
"Condition Monitoring of Instrument Transformers". |
06-06-2024 |
06-06-2024 |
5
|
40. |
ETD 34 : P2 |
Revision of IS 4146:1983, IS 4201:1983 IS 5547:1983, IS 6949:1973 |
06-06-2024 |
06-06-2024 |
5
|
41. |
ETD 34 : P3 |
Formulation of Indian Standard on "Maintenance and Installation of Instrument Transformers". |
06-06-2024 |
06-06-2024 |
7
|
42. |
ETD 37 : P1 |
Overhead Transmission line Conductor specification |
21-08-2024 |
21-08-2024 |
9
|
43. |
ETD 37 : P2 |
Accessories for overhead lines |
21-08-2024 |
21-08-2024 |
9
|
44. |
ETD 37 : P3 |
Review of standards related to Design, Installation and Maintenance for Overhead Power Lines |
03-12-2024 |
03-12-2024 |
7
|
45. |
ETD 49 : P1 |
To prepare Indian Standard on intelligent and connected lighting system |
23-06-2023 |
31-01-2025 |
4
|
46. |
ETD 49 : P2 |
To revise IS 1944 'Code of practice for lighting of public thoroughfares' |
19-07-2023 |
31-12-2024 |
6
|
47. |
ETD 49 : P3 |
To revise IS 10322 series inline with latest practices |
10-05-2024 |
31-01-2025 |
8
|
48. |
ETD 49 : P5 |
Revision of SP 72: NLC Part 5 Interior Illumination in relation to the requirements outlined in the revised draft of IS 3646 |
28-10-2024 |
31-12-2024 |
6
|
49. |
ETD 52 : P1 |
To prepare draft for BMS for EV |
28-04-2023 |
31-10-2024 |
17
|