S No Group Number Scope of work Date of creation Time Frame No of Members
1. ETD 02 : P3 - - 4
2. ETD 02 : P4 - - 6
3. ETD 02 : P5 - - 5
4. ETD 02 : P6 for revision of IS 15652 : 2006 29-08-2022 29-08-2022 4
5. ETD 02 : P7 Formulation Indian Standards on Heat Shrinkable Sleeve Testing 29-08-2022 29-08-2022 4
6. ETD 03 : P3 1.Preparation of the working draft in respect of the revision of IS 335:2018 within 3 months. 2.Examine and provide technical inputs on all the comments and queries received on IS 335:2018 to the committee. 16-05-2024 16-08-2024 9
7. ETD 07 : P1 The scope of work of the Panel is to conduct a comprehensive review and detailed analysis of ballot documents and standards issued by IEC TC 121 (Low-voltage switchgear and controlgear assemblies) and its Subcommittee SC 121A (Low-voltage switchgear and controlgear). The Panel aims to ensure the technical accuracy, relevance, and alignment of these documents with national requirements and industry practices, while representing the national viewpoint effectively in the international standardization process. To ensure that the national viewpoint is adequately represented and that technical content aligns with the interests and requirements of stakeholders. 01-09-2024 01-09-2024 6
8. ETD 07 : P2 The scope of work of the Panel is to conduct a comprehensive review and detailed analysis of ballot documents and standards issued by IEC SC 121B (Low-voltage switchgear and controlgear assemblies). The Panel aims to ensure the technical accuracy, relevance, and alignment of these documents with national requirements and industry practices, while representing the national viewpoint effectively in the international standardization process. 01-09-2024 01-09-2024 6
9. ETD 07 : P3 The scope of work of the Panel is to conduct a comprehensive review and detailed analysis of ballot documents and standards issued by IEC SC 23E (Circuit-breakers and similar equipment for household use). The Panel aims to ensure the technical accuracy, relevance, and alignment of these documents with national requirements and industry practices, while representing the national viewpoint effectively in the international standardization process. 01-09-2024 01-09-2024 5
10. ETD 08 : P1 Preparation of new standard on Code of Practice for On-site Diagnostic Tests and Condition Monitoring of High Voltage Substation Equipment 26-08-2024 31-12-2024 8
11. ETD 08 : P2 Review of standards related to common Specifications for High-voltage switchgear and control gear 03-12-2024 01-05-2025 0
12. ETD 09 : P12 Low Voltage cables upto 1100 V and test methods 28-10-2024 27-10-2026 10
13. ETD 09 : P13 High voltage cables above 1100V and test methods 28-10-2024 27-10-2026 10
14. ETD 09 : P14 cable accessories and test methods 28-10-2024 28-10-2026 7
15. ETD 11 : P3 To prepare Preliminary Drafts (P-draft) on Potentization process, devices and machines used in homoeopathy. The WG may also examine and resolve the comments received on these Drafts. 12-06-2023 31-12-2025 6
16. ETD 13 : P4 Maintenance of IS 16444 (Parts 1 and 2), drafting of amendments and communication technology 08-05-2019 20-08-2025 21
17. ETD 13 : P2 Maintenance of IS 13779, IS 14697 and IS 15884 08-05-2019 20-08-2025 16
18. ETD 13 : P1 Maintenance of IS 15959 series of standards 08-05-2019 20-09-2025 22
19. ETD 13 : P5 Revision of IS 8923:1978 Warning symbol for dangerous voltages and Revision of: IS 2551:1982 Danger Notice Plates a. Conduct an extensive study and comparative analysis of existing literature, research papers, international standards, and any other published information . b. Evaluate the level of manufacturing bases in the country to understand the capabilities and quality of production facilities. c. Assess the testing infrastructure in the country to determine the availability and adequacy of facilities for conducting product testing and quality assurance. 01-08-2024 30-11-2024 9
20. ETD 14 : P2 i. Preparation of working draft for 25A rating plugs and sockets outlet under IS 1293:2019 ii. Preparation of working draft for New standards on Plugs and sockets outlets ii. Review/Revision of existing existing standards on the subject 23-06-2024 31-03-2025 5
21. ETD 16 : P10 Transition of Security Mechanism in IS 15959 series of standards 30-09-2019 20-08-2025 13
22. ETD 16 : P1 - - 14
23. ETD 16 : P4 - - 9
24. ETD 16 : P5 - - 5
25. ETD 16 : P7 - - 10
26. ETD 16 : P9 - - 8
27. ETD 16 : P11 - - 7
28. ETD 16 : P12 - - 6
29. ETD 16 : P14 Standardization for the Packs used in Naturopathy Therapy 20-07-2023 31-12-2025 7
30. ETD 16 : P13 Refractory Test Piece Preparation via Gunning Techniques and for looking after documents prepared by ISO WG 25. 15-09-2024 08-10-2024 5
31. ETD 16 : P6 Working Group on Housing in Coastal areas 16-10-2024 16-10-2024 7
32. ETD 18 : P1 To review the documents and Indian standards on Temperature Measurement under ETD 18, Industrial Process Measurement and control Sectional Committee. 23-06-2024 31-03-2025 3
33. ETD 18 : P2 To review the documents and Indian standards on Electric Furnaces under ETD 18, Industrial Process Measurement and control Sectional Committee. 23-06-2024 31-03-2025 2
34. ETD 20 : P1 Revision of Standard on Earthing, IS 3043 a. Conduct an extensive study and comparative analysis of existing literature, research papers, international standards, and any other published information related to Earthing. b. Evaluate the level of manufacturing bases in the country to understand the capabilities and quality of production facilities. c. Assess the testing infrastructure in the country to determine the availability and adequacy of facilities for conducting product testing and quality assurance. d. Identifying the potential advantages, limitations, and challenges associated with implementing Earthing systems in various sectors such as residential, commercial, and industrial and propose draft requirements to be included in the revision of IS 3043. 18-06-2024 18-02-2025 9
35. ETD 22 : P1 Review/Revision of IS 4051, IS 9559 , IS 2772 and IS 11333. 01-09-2024 01-09-2024 9
36. ETD 23 : P3 To review and revise the following Indian Standards related to LED: a) IS 16102 (Part 1 & Part 2): Self - Ballasted led lamps for general lighting services- Safety and Performance b) IS 16103 (Part 1 & Part 2): Led modules for general lighting: safety and performance c) IS 16614 (Part 1 & Part 2): Double-Capped LED Linear Lamps : safety and performance 10-02-2023 - 6
37. ETD 25 : P4 To prepare new and revision documents of IS 17900 series on Lifts for transport of persons and goods and resolve any queries/provide inputs. Working drafts of other new subjects shall also be prepared by the panel for further discussion in the sectional committee. 18-03-2021 15-10-2025 19
38. ETD 32 : P3 Revision of IS 2082 Stationery storage type electric water heaters 25-06-2024 15-11-2024 9
39. ETD 34 : P1 "Condition Monitoring of Instrument Transformers". 06-06-2024 06-06-2024 5
40. ETD 34 : P2 Revision of IS 4146:1983, IS 4201:1983 IS 5547:1983, IS 6949:1973 06-06-2024 06-06-2024 5
41. ETD 34 : P3 Formulation of Indian Standard on "Maintenance and Installation of Instrument Transformers". 06-06-2024 06-06-2024 7
42. ETD 37 : P1 Overhead Transmission line Conductor specification 21-08-2024 21-08-2024 9
43. ETD 37 : P2 Accessories for overhead lines 21-08-2024 21-08-2024 9
44. ETD 37 : P3 Review of standards related to Design, Installation and Maintenance for Overhead Power Lines 03-12-2024 03-12-2024 7
45. ETD 49 : P1 To prepare Indian Standard on intelligent and connected lighting system 23-06-2023 31-01-2025 4
46. ETD 49 : P2 To revise IS 1944 'Code of practice for lighting of public thoroughfares' 19-07-2023 31-12-2024 6
47. ETD 49 : P3 To revise IS 10322 series inline with latest practices 10-05-2024 31-01-2025 8
48. ETD 49 : P5 Revision of SP 72: NLC Part 5 Interior Illumination in relation to the requirements outlined in the revised draft of IS 3646 28-10-2024 31-12-2024 6
49. ETD 52 : P1 To prepare draft for BMS for EV 28-04-2023 31-10-2024 17