1. |
AYD 01 : P2 |
This working group has been created to revise IS 5511 : 1991. |
06-09-2024 |
31-03-2025 |
5
|
2. |
AYD 01 : P1 |
This working group has been created to revise IS 11368 (Part 1) : 1985. |
06-09-2024 |
31-03-2025 |
8
|
3. |
AYD 01 : P6 |
|
- |
- |
4
|
4. |
AYD 01 : P7 |
|
- |
- |
6
|
5. |
AYD 01 : P8 |
|
- |
- |
5
|
6. |
AYD 01 : P9 |
|
- |
- |
6
|
7. |
AYD 02 : P1 |
The scope of fuel filters in propulsion, powertrain, and powertrain fluids encompasses the design, implementation, and maintenance of filtration systems that ensure clean fuel delivery to the engine. |
28-10-2024 |
28-10-2024 |
5
|
8. |
AYD 02 : P4 |
Review of IS 1448 (Part 18): 2020 - Method of test for petroleum and its products Part 18 distillation of petroleum products (Third Revision). |
30-10-2024 |
30-04-2025 |
4
|
9. |
AYD 02 : P5 |
To revise IS 613. |
06-08-2024 |
31-03-2025 |
5
|
10. |
AYD 02 : P6 |
The Terms of Reference for CHD 36/WG 2, 'Review of IS 1622, Methods of Sampling and Microbiological Examination of Water', are as follows:
1. Review and prepare a revised draft for IS 1622.
2. Deliberate and resolve comments received on IS 1622 when circulated as both the preliminary and wide circulation drafts.
|
08-11-2024 |
10-02-2025 |
4
|
11. |
AYD 02 : P7 |
Study of quality requirements of grades of Hot-rolled and cold rolled Stainless Steels used for structural purposes |
21-10-2024 |
21-10-2024 |
4
|
12. |
AYD 02 : P8 |
IS 3261:1980 - Study of quality requirements of carbon steel forgings for shipbuilding industry. |
21-10-2024 |
13-11-2024 |
3
|
13. |
AYD 02 : P10 |
|
- |
- |
2
|
14. |
AYD 03 : P1 |
New Standard on sealed silos for storage of foodgrains |
20-02-2024 |
20-02-2024 |
4
|
15. |
AYD 03 : P3 |
Methods of Chemical analysis of Ferro-niobium |
01-04-2024 |
30-04-2025 |
5
|
16. |
AYD 03 : P4 |
ICP - OES Test method of Iron Ores ; ISO 11535 |
28-10-2024 |
31-07-2025 |
4
|
17. |
AYD 03 : P6 |
Revision of IS IS 17795 : 2022 / ISO 204 : 2018 Metallic materials — Uniaxial creep testing in tension — Method of test |
10-05-2024 |
31-03-2025 |
4
|
18. |
AYD 03 : P7 |
Revision of IS 2629 Code of Practice for Process Design Testing and Application of Hot Dip Galvanizing of Iron and Steel - Part 1 : Batch Process and IS 6745 Methods for determination of mass of zinc coating on zinc coated iron and steel articles |
28-08-2024 |
31-03-2025 |
5
|
19. |
AYD 03 : P2 |
Revision of IS 3618 : 1966 Specification for Phosphate Treatment of Iron and Steel for protection against corrosion |
28-08-2024 |
31-03-2025 |
1
|
20. |
AYD 03 : P5 |
The Amendment Working Group for Indian Standards focuses on reviewing, updating, and amending existing standards to ensure their relevance, accuracy, and alignment with current industry practices. It aims to maintain standards that meet national and international benchmarks for quality and safety. |
02-09-2024 |
31-12-2024 |
4
|
21. |
AYD 03 : P8 |
|
- |
- |
2
|
22. |
AYD 03 : P9 |
|
- |
- |
4
|
23. |
AYD 03 : P10 |
|
- |
- |
1
|
24. |
AYD 03 : P11 |
|
- |
- |
4
|
25. |
AYD 03 : P12 |
|
- |
- |
3
|
26. |
AYD 03 : P13 |
|
- |
- |
3
|
27. |
AYD 03 : P14 |
|
- |
- |
3
|
28. |
AYD 03 : P15 |
|
- |
- |
3
|
29. |
AYD 03 : P16 |
|
- |
- |
4
|
30. |
AYD 03 : P17 |
|
- |
- |
3
|
31. |
AYD 04 : P1 |
The scope of work for general fleet management and commercial/freight operations involves overseeing the planning, coordination, and optimization of a fleet of vehicles used for transporting goods and services. |
28-10-2024 |
28-10-2024 |
5
|
32. |
AYD 04 : P2 |
The scope of work for public transport and emergency services involves the coordination, planning, and management of transportation systems designed to facilitate efficient movement for both everyday commuters and emergency response teams. |
28-10-2024 |
28-10-2024 |
4
|
33. |
AYD 04 : P3 |
Child Restraint System |
20-11-2024 |
20-11-2025 |
6
|
34. |
AYD 05 : P1 |
Standardization in the field of wildlife observation tourism and, examining and providing comments on the ballots issued on the subject by ISO/TC 228/WG07 |
17-10-2024 |
28-10-2026 |
3
|
35. |
AYD 05 : P2 |
Standardization in the field of air activities and, examining and providing comments on the ballots issued on the subject by ISO /TC 228/WG07 |
17-10-2024 |
28-10-2026 |
2
|
36. |
AYD 05 : P3 |
Standardization in the field of aerial adventure activities and, examining and providing comments on the ballots issued on the subject by ISO/TC 228/WG07 |
17-10-2024 |
28-10-2026 |
1
|
37. |
AYD 05 : P4 |
Standardization in the field of motorized activities and, examining and providing comments on the ballots issued on the subject by ISO/TC 228/WG07 |
17-10-2024 |
28-10-2026 |
4
|
38. |
AYD 06 : P1 |
Noise Measurement |
20-11-2024 |
20-11-2025 |
3
|
39. |
AYD 06 : P2 |
Testing of Subsystems |
20-11-2024 |
20-11-2025 |
4
|
40. |
AYD 07 : P1 |
The scope of work for castors and wheels includes the design, selection, and evaluation of various types of wheels and castors for optimal performance in different applications. This involves assessing load capacity, material composition, tread design, and wheel diameter to ensure suitability for specific environments, such as industrial, commercial, or residential settings. |
28-10-2024 |
28-10-2024 |
11
|
41. |
AYD 07 : P2 |
The scope of work for identifiers in intelligent transport systems (ITS) involves developing and implementing standardized identification methods for various components, vehicles, and infrastructure within the transportation network. This includes defining unique identifiers for vehicles, traffic signals, sensors, and other ITS elements to facilitate data exchange and interoperability among different systems. |
28-10-2024 |
28-10-2024 |
6
|
42. |
AYD 07 : P3 |
The scope of work for an Operational Improvement Group (OIG) involves identifying, analyzing, and implementing strategies to enhance operational efficiency and effectiveness within an organization. This includes conducting performance assessments, workflow analyses, and root cause investigations to identify areas for improvement. The OIG will develop and recommend best practices, process optimizations, and resource allocation strategies to streamline operations and reduce waste. |
28-10-2024 |
28-10-2024 |
8
|
43. |
AYD 07 : P4 |
The scope of work for program coordination in Intelligent Transport Systems (ITS) involves overseeing the integration and implementation of various ITS projects to enhance transportation efficiency and safety. This includes coordinating activities among stakeholders, such as government agencies, transportation authorities, technology providers, and community organizations, to ensure alignment with strategic goals. |
28-10-2024 |
28-10-2024 |
8
|
44. |
AYD 07 : P5 |
Standardization in the field of sustainable beaches |
17-10-2024 |
28-10-2026 |
5
|
45. |
AYD 07 : P6 |
Review of IS 11861, IS 11901, IS 11902, IS 12389, IS 12442, IS 12644, IS 12828, IS 7882, IS 7883, IS 8513, IS 8514, IS 8515, IS 8560, IS 8561, IS 8937 and IS 8938 |
01-04-2024 |
31-12-2024 |
6
|