Document Details
Name of Department/Committee : PCD 25
Document Number : PCD 25 ( 27247)
Document Title [English] : SPECIFICATION FOR CUTTING OIL SOLUBLE CLEAR First Revision of IS 9611
Document Title [Hindi] : कटिंग के प्रयोग के लिए घुलनशील एवं साफ़ तेल की विशिष्टि (IS 9611 का पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 75.100
Date of Project Approval : 08-01-2025
Standards to be Revised :
Sl.No. Is No & Year
1 IS 9611: 1980
Standards to be Superseded :


Classification Details
Group : Coal and Petroleum products
Sub Group : Petroleum products
Sub Sub Group : Lubricants
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Heavy Industries
  • Ministry of Petroleum and Natural Gas
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard prescribes the requirements and methods of sampling and test for cutting oil, soluble, clear type, intended for use in grinding, cutting and other operations where a translucent emulsion is required for clear visibility of the workpiece and tools.
2 The standard was originally published in 1980. This first revision has been brought out to keep pace with the latest technological developments and international practices. The major changes incorporated in this revision are: a) Test methods have been updated for emulsion and frothing tests, and thermal stability test; and b) pH and test method for pH has been included, keeping in view the requirement of condition monitoring of the aqueous emulsion during its usage.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 08-01-2025 08-06-2025 23-08-2025 07-01-2026 MS. KREETI DAS 08-01-2025
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 08-01-2025 -------
2 P-Draft Waived 08-01-2025 As this is a revision, P draft is being waived off. -------
3 WC Draft 08-01-2025 Duration : 60 Days
Submitted for HOD approval
Remarks : WC draft attached for approval please
-------
4 WC Draft 09-01-2025 WC approved by HOD
PCDC   -------