Document Details |
|||||
Name of Department/Committee : | LITD 11 | ||||
---|---|---|---|---|---|
Document Number : | LITD 11 ( 27239) | ||||
Document Title [English] : | Calibration of fibre - Optic power meters Second Revision | ||||
Document Title [Hindi] : | प्रकाशित तंतु पावर मीटरो का अंशशोधन (दूसरा पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | ICS: 33.140, 33.180.10 | ||||
Date of Project Approval : | 01-10-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Electronic and Telecom equipments, components and devices |
Sub Group : | Electronic components and devices |
Sub Sub Group : | Reliability of Electronic and Electrical items |
Aspects : | Safety Standard |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | IEC 61315:2019 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | Fibre-optic power meters are designed to measure optical power from fibre-optic sources as accurately as possible. This capability depends largely on the quality of the calibration process. In contrast to other types of measuring equipment, the measurement results of fibre-optic power meters usually depend on many conditions of measurement.This document defines all of the steps involved in the calibration process: establishing the calibration conditions, carrying out the calibration, calculating the uncertainty, and reporting the uncertainty, the calibration conditions and the traceability. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 01-10-2024 | ------- | ||
2 | P-Draft | 07-01-2025 | Covering letter generated | ------- | |
3 | P-Draft | 07-01-2025 | Duration : 30 Days Remarks : The committee decided to issue P-draft for a period of One month all committee members are requested to provide their inputs |
LITD 11, LITD 11, , | ------- |
4 | Skipped to W-Draft | 11-02-2025 | Stage-Changed | ------- | |
5 | WC Draft | 11-02-2025 | Duration : 60 Days Submitted for HOD approval Remarks : Committee in its 19th meeting held on 01st October 2024 decided to issue this document in Wide circulation for two months All the committee members are requested to provide their comments on or before the due date 12 April 2025 |
------- | |
6 | WC Draft | 12-02-2025 | WC approved by HOD |
LITDC LITD 11, LITD 11 : P1, | ------- |