Document Details
Name of Department/Committee : LITD 11
Document Number : LITD 11 ( 27239)
Document Title [English] : Calibration of fibre - Optic power meters Second Revision
Document Title [Hindi] : प्रकाशित तंतु पावर मीटरो का अंशशोधन (दूसरा पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS: 33.140, 33.180.10
Date of Project Approval : 01-10-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 14976: 2012
Standards to be Superseded :


Classification Details
Group : Electronic and Telecom equipments, components and devices
Sub Group : Electronic components and devices
Sub Sub Group : Reliability of Electronic and Electrical items
Aspects : Safety Standard
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Electronics and Information Technology
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : IEC 61315:2019
Organization Type: IEC

Sl.No. Synosis Points
1 Fibre-optic power meters are designed to measure optical power from fibre-optic sources as accurately as possible. This capability depends largely on the quality of the calibration process. In contrast to other types of measuring equipment, the measurement results of fibre-optic power meters usually depend on many conditions of measurement.This document defines all of the steps involved in the calibration process: establishing the calibration conditions, carrying out the calibration, calculating the uncertainty, and reporting the uncertainty, the calibration conditions and the traceability.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 07-01-2025 07-06-2025 22-08-2025 06-01-2026 Mr. PRIYANSHU SHARMA 07-01-2025
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 01-10-2024 -------
2 P-Draft 07-01-2025 Covering letter generated -------
3 P-Draft 07-01-2025 Duration : 30 Days
Remarks : The committee decided to issue P-draft for a period of One month all committee members are requested to provide their inputs
LITD 11, LITD 11, ,  -------
4 Skipped to W-Draft 11-02-2025 Stage-Changed -------
5 WC Draft 11-02-2025 Duration : 60 Days
Submitted for HOD approval
Remarks : Committee in its 19th meeting held on 01st October 2024 decided to issue this document in Wide circulation for two months All the committee members are requested to provide their comments on or before the due date 12 April 2025
-------
6 WC Draft 12-02-2025 WC approved by HOD
LITDC  LITD 11, LITD 11 : P1, -------