Name of Department/Committee : LITD 11
Document Number : LITD 11 ( 27237)
Document Title [English] : Optical fibres Part 1-22: Measurement methods and test procedures - Length measurement First Revision
Document Title [Hindi] : प्रकाशित तंतु भाग -1 मापन विधियाँ और परीक्षण प्रक्रियाएं अनुभाग 22 लम्बाई मापन (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS: 33.180.10
Date of Project Approval : 01-10-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 60793 : Part 1 : Sec 22: 2001
Standards to be Superseded :


Classification Details
Group : Electronic and Telecom equipments, components and devices
Sub Group : Electronic components and devices
Sub Sub Group : Reliability of Electronic and Electrical items
Aspects : Safety Standard
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Electronics and Information Technology
Sustainable development Goals :
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 60793-1-22: 2024
Organization Type: IEC

Sl.No. Synosis Points
1 Publications in the IEC 60793-1 series concern measurement methods and test procedures as they apply to optical fibres. The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising all national electrotechnical committees (IEC National Committees). The object of IEC is to promote international co-operation on all questions concerning standardization in the electrical and electronic fields. To this end and in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC Publication(s)”). Their preparation is entrusted to technical committees; any IEC National Committee interested in the subject dealt with may participate in this preparatory work.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 07-01-2025 07-06-2025 22-08-2025 06-01-2026 Mr. PRIYANSHU SHARMA 07-01-2025
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 01-10-2024 -------
2 P-Draft 07-01-2025 Covering letter generated -------
3 P-Draft 07-01-2025 Duration : 30 Days
Remarks : The committee decided to issue P-draft for a period of One month all committee members are requested to provide their inputs
LITD 11, LITD 11, ,  -------
4 Skipped to W-Draft 13-02-2025 Stage-Changed -------
5 WC Draft 13-02-2025 Duration : 60 Days
Submitted for HOD approval
Remarks : Committee in its 19th meeting held on 01st October 2024 decided to issue this document in Wide circulation for two months All committee members are requested to provide their comments on or before the due date of 14 April 2025
-------
6 WC Draft 18-02-2025 WC approved by HOD