Document Details |
|||||
Name of Department/Committee : | ETD 31 | ||||
---|---|---|---|---|---|
Document Number : | ETD 31 ( 27151) | ||||
Document Title [English] : | Uninterruptible power systems UPS: Part 3 method of specifying the performance and test requirements | ||||
Document Title [Hindi] : | अबाधित पॉवर प्रणालियाँ (यूपीएस) भाग 3 कार्यकारिता एवं परीक्षण अपेक्षाएँ निर्दिष्ट करने की पद्धति | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 29.200 | ||||
Date of Project Approval : | 04-12-2024 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Electrical Appliances and Accessories |
Sub Group : | Plugs, Sockets, Switches and accessories |
Sub Sub Group : | Switch plugs, sockets and accessories |
Aspects : | Methods of tests |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | IEC 62040-3 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This document specifies performance and test requirements of a complete UPS and, where applicable, of individual UPS functional units. Requirements for the individual UPS functional units found in IEC publications listed in the Bibliography apply so far that they are not in contradiction with this document. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 04-12-2024 | ------- | ||
2 | P-Draft Waived | 27-12-2024 | ------- | ||
3 | WC Draft | 27-12-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 29-12-2024 | WC approved by HOD |
ETDC | ------- |