Document Details
Name of Department/Committee : FAD 11
Document Number : FAD 11 ( 27065)
Document Title [English] : Agricultural tractor trailer - Specification fourth revision of IS 8213
Document Title [Hindi] : कृषि ट्रैक्टर के लिए ट्राली - विशिष्टि ( आइ एस 8213 का चौथा पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 2
ICS Code : 65.060.10
Date of Project Approval : 18-10-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 8213: 2000
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 8213: 2000


Classification Details
Group : Agriculture, Agricultural Products and Implements
Sub Group : Agricultural Implements and godowns
Sub Sub Group : Tractors & Power Tillers
Aspects : Product Specification
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Agriculture - Department of Agriculture and Farmer Welfare
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 Tractor operated trailers are used for transport of farm produce. This standard has been prepared for the guidance of manufacturers and purchasers in the production and selection of trailers of proper quality. This standard was first published in 1976 and subsequently revised in 1983 and 1987
2 The current revision (fourth) of the standard has been undertaken to incorporate following modifications: a) Minimum capacity of balanced-trailer has been increased from 2 to 5 tonnes and range of 2 to 10 tonnes has been provided to cover all the models falling in this range. b) Parking and service brakes requirement has been changed to recommendatory from obligatory. c) Requirement of slow moving vehicle has been incorporated in the standard which was covered in IS 12239 (Part 2) : 1999 “Tractors and machinery for agriculture and forestry – Technical means for ensuring safety: Part 2 Tractors (first revision)” d) Dimensions of various components of axle assembly have been modified as per current manufacturing practices.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 06-12-2024 06-04-2025 06-05-2025 06-09-2025 Mr. Vikrant Chauhan 06-12-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 18-10-2024 -------
2 P-Draft Waived 06-12-2024 The FAD 11 committee in its 28th meeting held on 18 October 2024, decided to send the draft revision of IS 8213 into wide circulation for a period of 60 days for commenting. -------
3 WC Draft 06-12-2024 Duration : 62 Days
Submitted for HOD approval
Remarks : The FAD 11 committee in its 28th meeting held on 18 October 2024 decided to send the draft revision of IS 8213 into wide circulation for a period of 60 days for commenting
-------
4 WC Draft 06-12-2024 WC approved by HOD
FADC  FAD 11, -------