Document Details
Name of Department/Committee : EED 01
Document Number : EED 01 ( 27051)
IS Number (Technical Department) : IS/ISO 14001: 2015
Document Title [English] : Amendment No. 1 to IS/ISO 14001 : 2015 Environmental Management Systems — Requirements with Guidance for Use ( Second Revision )
Document Title [Hindi] : संशोधन सं. 1 पर्यावरणीय प्रबंधन पद्धतियाँ —उपयोग के लिए मार्गदर्शन सहित अपेक्षाएँ ( दूसरा पुनरीक्षण )
Document Type : Amendment
Amendment No : 1
Language : English
Priority : 3
ICS Code :
Date of Project Approval : 14-03-2024
Standards to be Superseded :

Sl.No. Synosis Points
1 This document is an amendment to IS/ISO 14001:2015
2 This Amendment No. 1 is identical with Amendment No. 1 ‘Climate action changes’ of IS/ISO 14001 : 2015, Environmental management systems — Requirements with guidance for use ( second revision ) issued in 2024 by International Organization for Standardization (ISO).

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 04-12-2024 04-03-2025 04-04-2025 04-06-2025 Mr. Lalit Yadav 04-12-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 14-03-2024 -------
2 P-Draft Waived 04-12-2024 Committee decision -------
3 WC-Draft Waived 13-12-2024 In line with the ISO London Declaration on Climate Change ISO has introduced two new statements into several management system standards These additions are designed to address the impact of climate change on achieving the intended outcomes of management systems The changes have been incorporated into the Harmonized Structure Appendix 2 of Annex SL in the ISOIEC Directives Part 1 Consolidated ISO Supplement BIS operates a Management System Certification Scheme accredited by NABCB based on ISISO 14001:2015 Considering the immediate relevance of this amendment it is essential to adopt it into the Indian Standard to prevent potential non-conformities with NABCB requirements Due to the urgency and non-controversial nature of the amendment the committee approval has been taken to waive off the wide circulation through e-circulation for its immediate implementation -------
4 Finalization 13-12-2024 In view of the reasons mentioned above for waiving off the WC draft the draft has been finalized with the approval of chairperson EED 01 and being send for publication -------
5 Final Draft 13-12-2024 Submited for HOD approval

Remarks: National Foreword and base document is has been added
-------
6 Final Draft 13-12-2024 Final Draft rejected by HOD
Remarks: National Foreword has not been found enclosed. Please attach and resend.
-------
7 Final Draft 13-12-2024 Submited for HOD approval

Remarks: National Foreword is enclosed
-------