Document Details
Name of Department/Committee : SSD 10
Document Number : SSD 10 ( 27046)
Document Title [English] : Electronic Signatures and Infrastructures ESI XAdES digital signatures Part 1: Building blocks and XAdES baseline signatures
Document Title [Hindi] : इलेक्ट्रॉनिक हस्ताक्षर और इन्फ्रास्ट्रक्चर (ईएसआई) — एक्सएडीईएस डिजिटल हस्ताक्षर; भाग 1: बिल्डिंग ब्लॉक्स और एक्सएडीईएस आधारभूत हस्ताक्षर
Document Type : New
Language : English
Priority : 3
ICS Code : 35.020
Date of Project Approval : 08-11-2024
Standards to be Superseded :


Classification Details
Group : IT and IT Enabled Services
Sub Group : IT and IT Enabled Services
Sub Sub Group : IT and IT Enabled Services
Aspects : Service Specification
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Electronics and Information Technology
Sustainable development Goals :
  • DECENT WORK AND ECONOMIC GROWTH
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard specifies XAdES digital signatures. XAdES signatures build on XML digital signatures, by incorporation of signed and unsigned qualifying properties, which fulfil certain common requirements (such as the long term validity of digital signatures, for instance) in a number of use cases. The standard specifies XML Schema definitions for the aforementioned qualifying properties as well as mechanisms for incorporating them into XAdES signatures. The standard specifies formats for XAdES baseline signatures, which provide the basic features necessary for a wide range of business and governmental use cases for electronic procedures and communications to be applicable to a wide range of communities when there is a clear need for interoperability of digital signatures used in electronic documents. The standard document defines four levels of XAdES baseline signatures addressing incremental requirements to maintain the validity of the signatures over the long term, in a way that a ce

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 03-12-2024 03-05-2025 18-07-2025 03-12-2025 Mr. DHARAMSOTH SANTHOSH 03-12-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 08-11-2024 -------
2 P-Draft 03-12-2024 Covering letter generated -------
3 P-Draft 03-12-2024 Duration : 15 Days
Remarks : All the members of SSD 10 are requested to kindly review the P-draft document and provide your comments before last date of comment ie 18 December 2024 Please note It is mandatory to comment on the P-draft document by the Committee members In case you have no comment please mention as NO comment
SSD 10, -------
4 Skipped to W-Draft 10-03-2025 Stage-Changed -------
5 WC Draft 10-03-2025 Duration : 60 Days
Submitted for HOD approval
Remarks : The document may be approved for Wide Circulation
-------
6 WC Draft 13-03-2025 WC rejected by HOD
Remarks: Please review clause 3.1 for editorial changes and discuss on contents under Syntax
-------