Document Details
Name of Department/Committee : CED 46
Document Number : CED 46 ( 27025)
Document Title [English] : National Building Code of India Part 11 Approach to Sustainability
Document Title [Hindi] : भारतीय राष्ट्रीय भवन संहिता भाग 11 संवहनियता के प्रति द्रष्टिकोण
Document Type : Revision
Language : English
Priority : 3
ICS Code : 01.120: 91.040.01
Date of Project Approval : 26-06-2024
Standards to be Revised :
Sl.No. Is No & Year
1 SP 7: 2016
Standards to be Superseded :
Sl.No. Is No & Year
1 SP 7: 2016


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Construction practices, measurement and management
Sub Sub Group : NBC of India
Aspects : Others
Risk : High
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Housing and Urban Affairs
Sustainable development Goals :
  • SUSTAINABLE CITIES AND COMMUNITIES
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 A data collection template for embodied energy and carbon of Indian construction materials has been included in informative Annex E. In alignment with the evolving demands of sustainability and resilience, this edition of the Part 11 of NBC incorporates significant updates to address contemporary challenges and improve its applicability across the built environment. a) The scope of this Part has been thoroughly reviewed and updated to respond to emerging challenges, including climate change, ecological disruption, and the pervasive issue of widespread toxicity in materials and systems. b) Clause 3, titled Approach to Sustainability, has been enhanced to reflect the latest practices and methodologies that support sustainable development.
2 c) Clause 9 on Materials has undergone a comprehensive revision, now including detailed provisions on environmental impact categories, life cycle stages, whole-building life cycle assessment (LCA) methodology, LCA tools, and guidelines for environmental declarations and disclosures. These updates aim to promote transparency and accountability in material selection and usage. d) The provisions related to Lifts, Escalators, and Moving Walks have been updated to integrate advancements in technology, safety measures, and energy efficiency. e) A dedicated data collection template for assessing the embodied energy and carbon footprint of Indian construction materials has been included to encourage data-driven decision-making and facilitate sustainable material sourcing. f) References to all the concerned Indian standards have been updated.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 29-11-2024 29-04-2025 14-07-2025 29-11-2025 S ARUN KUMAR 29-11-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 26-06-2024 -------
2 P-Draft 30-11-2024 Covering letter generated -------
3 P-Draft 30-11-2024 Duration : 21 Days CED 46, CED 46, CED 46 : P1, CED 46 : P2, CED 46 : P3, CED 46 : P4, CED 46 : P5, CED 46 : P6, CED 46 : P7, CED 46 : P8, CED 46 : P9, CED 46 : P10, CED 46 : P11, CED 46 : P12, CED 46 : P13, CED 46 : P14, CED 46 : P15, CED 46 : P16, CED 46 : P17, CED 46 : P18, CED 46 : P19, CED 46 : P20, CED 46 : P21, CED 46 : P22,  -------
4 Skipped to W-Draft 13-04-2025 Stage-Changed -------
5 WC Draft 13-04-2025 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 13-04-2025 WC approved by HOD
CEDC  CED 46, EED 01, EED 07, CED 46 : P1, CED 46 : P2, CED 46 : P3, CED 46 : P4, CED 46 : P5, CED 46 : P6, CED 46 : P7, CED 46 : P8, CED 46 : P9, CED 46 : P10, CED 46 : P11, CED 46 : P12, CED 46 : P13, CED 46 : P14, CED 46 : P15, CED 46 : P16, CED 46 : P17, CED 46 : P18, CED 46 : P19, CED 46 : P20, CED 46 : P21, CED 46 : P22, -------