Document Details |
|||||
Name of Department/Committee : | CED 46 | ||||
---|---|---|---|---|---|
Document Number : | CED 46 ( 27006) | ||||
Document Title [English] : | National Building Code of India Part 9 Plumbing Services Section 4 Gas Supply | ||||
Document Title [Hindi] : | भारतीय राष्ट्रीय भवन संहिता भाग 9 प्लंबिंग सेवाएँ (ठोस कचरे के प्रंबधन सहित) अनुभाग 4 गैस की आपूर्ति | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 01.120: 91.040.01 | ||||
Date of Project Approval : | 20-12-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Construction practices, measurement and management |
Sub Sub Group : | General Construction, Painting and Glazing |
Aspects : | Others |
Risk : | High |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | Based on the experience gained in the use of this Section, the provisions have been modified in this revision. The significant changes incorporated in this revision include the following: a) New provisions have been introduced for the installation of sloped piping and drips to prevent gas system blockages, ensure proper condensate drainage, and facilitate cleaning, especially in systems handling wet gas. b) Comprehensive guidelines for the installation of shutoff valves have been added to ensure proper control, easy accessibility, and maintenance, with specific provisions for individual shutoff valves for each meter and tenant in multi-tenant buildings. c) The inclusion of over-pressure protection devices for gas systems has been mandated to ensure safe operation and prevent appliance damage due to excessive pressure. | |
2 | d) Detailed provisions for the installation and safe operation of equipment powered by internal combustion engines and gas turbines have been added, with guidelines for flexible gas supply connections to prevent system stress from equipment movement. e) Emphasis on proper installation practices for gas-powered equipment, ensuring systems are set up according to manufacturer instructions and safety standards, has been incorporated to minimize risks and enhance operational reliability. f) References to all the concerned Indian Standards have been updated. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 20-12-2023 | ------- | ||
2 | P-Draft | 29-11-2024 | Covering letter generated | ------- | |
3 | P-Draft | 29-11-2024 | Duration : 21 Days | CED 46, CED 46, CED 46 : P1, CED 46 : P2, CED 46 : P3, CED 46 : P4, CED 46 : P5, CED 46 : P6, CED 46 : P7, CED 46 : P8, CED 46 : P9, CED 46 : P10, CED 46 : P11, CED 46 : P12, CED 46 : P13, CED 46 : P14, CED 46 : P15, CED 46 : P16, CED 46 : P17, CED 46 : P18, CED 46 : P19, CED 46 : P20, CED 46 : P21, CED 46 : P22, | ------- |
4 | Skipped to W-Draft | 27-03-2025 | Stage-Changed | ------- | |
5 | WC Draft | 27-03-2025 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 27-03-2025 | WC approved by HOD |
CEDC CED 46, CED 46 : P1, CED 46 : P2, CED 46 : P3, CED 46 : P4, CED 46 : P5, CED 46 : P6, CED 46 : P7, CED 46 : P8, CED 46 : P9, CED 46 : P10, CED 46 : P11, CED 46 : P12, CED 46 : P13, CED 46 : P14, CED 46 : P15, CED 46 : P16, CED 46 : P17, CED 46 : P18, CED 46 : P19, CED 46 : P20, CED 46 : P21, CED 46 : P22, | ------- |