Document Details |
|||||
Name of Department/Committee : | CED 46 | ||||
---|---|---|---|---|---|
Document Number : | CED 46 ( 27002) | ||||
Document Title [English] : | National Building Code of India Part 9 Plumbing Services Section 1 Water Supply | ||||
Document Title [Hindi] : | भारतीय राष्ट्रीय भवन संहिता भाग 9 प्लंबिंग सेवाएँ (ठोस कचरे के प्रंबधन सहित) अनुभाग 1 जल आपूर्ति | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 01.120: 91.040.01 | ||||
Date of Project Approval : | 20-12-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Water supply, drainage and sanitation |
Sub Sub Group : | Water Handling |
Aspects : | Others |
Risk : | High |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | In this revision of the Section 1, the following significant changes/modifications have been incorporated:a) Population requirements for residential buildings have been updated, in 4.1. b) Occupant factor is introduced to arrive at water demand for warehouses and industrial occupancies. c) Suggestive breakup of water for general consumption is included, in 4.1.1.1. d) Table 1 ‘Water requirements for buildings other than residences’ now provides the quantity for various categories of Hotels. e) Storage requirement for hydro-pneumatic/pressurized water supply system have been included, in 4.4.10. f) Terminology has been updated by including drinking fountain, design flood elevation, demand recirculation water system, vacuum breaker, etc. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 20-12-2023 | ------- | ||
2 | P-Draft | 29-11-2024 | Covering letter generated | ------- | |
3 | P-Draft | 29-11-2024 | Duration : 21 Days | CED 46, CED 46, CED 46 : P1, CED 46 : P2, CED 46 : P3, CED 46 : P4, CED 46 : P5, CED 46 : P6, CED 46 : P7, CED 46 : P8, CED 46 : P9, CED 46 : P10, CED 46 : P11, CED 46 : P12, CED 46 : P13, CED 46 : P14, CED 46 : P15, CED 46 : P16, CED 46 : P17, CED 46 : P18, CED 46 : P19, CED 46 : P20, CED 46 : P21, CED 46 : P22, | ------- |
4 | Skipped to W-Draft | 30-03-2025 | Stage-Changed | ------- | |
5 | WC Draft | 30-03-2025 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 30-03-2025 | WC approved by HOD |
CEDC CED 46, CED 46 : P1, CED 46 : P2, CED 46 : P3, CED 46 : P4, CED 46 : P5, CED 46 : P6, CED 46 : P7, CED 46 : P8, CED 46 : P9, CED 46 : P10, CED 46 : P11, CED 46 : P12, CED 46 : P13, CED 46 : P14, CED 46 : P15, CED 46 : P16, CED 46 : P17, CED 46 : P18, CED 46 : P19, CED 46 : P20, CED 46 : P21, CED 46 : P22, CED 03, CED 24, CHD 13, CHD 36, | ------- |