Document Details
Name of Department/Committee : CED 39
Document Number : CED 39 ( 27624)
Document Title [English] : Criteria for Earthquake Resistant Design of Structures Part 4 Industrial Structures
Document Title [Hindi] : संरचनाओं के भूकंपरोधी डिज़ाइन के लिए मानदंड भाग 4 औद्योगिक संरचनाएँ
Document Type : Revision
Language : English
Priority : 3
ICS Code : 91.120.25
Date of Project Approval : 31-07-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 1893 : Part 4: 2024
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 1893 : Part 4: 2024


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Concrete structures
Sub Sub Group : Special Structures
Aspects : Code of Practice
Risk : Medium
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Housing and Urban Affairs
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
  • SUSTAINABLE CITIES AND COMMUNITIES
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 All industrial structures and stack-like structures other than nuclear installations shall be designed and constructed to resist the earthquake effects in accordance with the requirements and provisions of this standard. This standard describes the procedures for earthquake resistant design and provides the procedure of estimating the earthquake forces for design of such structures.
2 This standard shall also be referred for provisions related to earthquake resistant design of equipment and piping (including the seismic qualification of equipment).

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 20-02-2025 20-07-2025 05-10-2025 20-02-2026 Mr. JITENDRA KUMAR CHAUDHARY 20-02-2025
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 31-07-2024 -------
2 P-Draft Waived 20-02-2025 -------
3 WC Draft 20-02-2025 Duration : 45 Days
Submitted for HOD approval
-------
4 WC Draft 20-02-2025 WC approved by HOD
CEDC   -------
5 WC-Draft 27-02-2025 WC-Draft Email Notifications Sent CEDC, CED 39, -------