Document Details
Name of Department/Committee : MED 18
Document Number : MED 18 ( 27550)
Document Title [English] : BUILDING CONSTRUCTION MACHINERY AND EQUIPMENT CONCRETE PUMPS PART 2 PROCEDURE FOR EXAMINATION OF TECHNICAL PARAMETERS ( Modified Adoption of ISO 21573-2 )
Document Title [Hindi] : भवन निर्माण मशीनरी और उपकरण कंक्रीट पम्प भाग 2 तकनीकीय मानदंडो की जाँच प्रक्रिया ( ISO 21573-2 का संशोधित अधिग्रहण )
Document Type : New
Language : English
Priority : 3
ICS Code : 91.220
Date of Project Approval : 19-09-2024
Standards to be Superseded :
Sl.No. Is No & Year
1 IS/ISO 21573 : Part 2: 2008


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Construction practices, measurement and management
Sub Sub Group : Concrete machinery
Aspects : Methods of tests
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
Degree of Equivalence : Modified/Technically Equivalent
Identical/Equivalent Standards : ISO 21573-2
Organization Type: ISO

Sl.No. Synosis Points
1 This document specifies the procedure and requirements for examining the technical commercial specifications of factory new piston-type concrete pump and rotary-type concrete pump as defined in ISO 21573-1. This document specifies the procedure and requirements for examining the technical commercial specifications of factory new piston-type concrete pump and rotary-type concrete pump as defined in ISO 21573-1. It applies to mobile concrete pumps (with or without concrete-placing boom) and stationary concrete pumps.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 12-02-2025 12-07-2025 27-09-2025 11-02-2026 Mr. PRASOON YADAV 12-02-2025
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 19-09-2024 -------
2 WC Draft 13-02-2025 Duration : 30 Days
Submitted for HOD approval
Remarks : The Sectional Committee approved the draft document for Wide Circulation during 29th TC Meeting of MED 18
-------
3 WC Draft 18-02-2025 WC approved by HOD
MEDC  MED 18, -------