Document Details
Name of Department/Committee : MED 04
Document Number : MED 04 ( 27549)
Document Title [English] : Solar Flat Plate Collector - Specification Part 1 Requirements (Third Revision)
Document Title [Hindi] : सौर सपाट पट्टिका संग्राहक - विशिष्टि भाग 1 अपेक्षाऍं (तीसरा पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 27.160
Date of Project Approval : 17-12-2024
Standards to be Revised :
Sl.No. Is No & Year
1 IS 12933 : Part 1: 2003
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 12933 : Part 1: 2003


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Renewable energy devices
Sub Sub Group : Solar flat plate collector , Water heating system, Solar cooker , Bio gas plant & Biomass cook stove
Aspects : Product Specification
Risk : Low
Certification : Mandatory Certification
Short Commom Man's Title : Solar Flat Plate Collector - Specification Part 1 Requirements
ITCHS Code :
Ministry :
  • Ministry of New and Renewable Energy
Sustainable development Goals :
  • GOOD HEALTH AND WELL BEING
  • AFFORDABLE AND CLEAN ENERGY
  • RESPOSIBLE CONSUMPTION AND PRODUCTION
  • LIFE ON LAND
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This Indian Standard (Part 1) specifies the requirements of solar flat plate collector for water heating.
2 This standard does not apply to the following: a) Collector in whom heat transfer fluid may change phase (that is, heat pipe collectors and steam generating collectors); b) Concentrating collectors used in a system designed to generate mechanical energy/electricity; c) Collectors in which the thermal storage unit is an integral part of the collector so that the collection and the storage processes cannot be separated; d) Unglazed flat plate collector; e) Installation or mounting of solar collectors; and f) Tracking mechanism of the sun following collector system.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 12-02-2025 12-07-2025 27-09-2025 11-02-2026 ANKITA VIDHYARTHI 12-02-2025
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 17-12-2024 -------
2 P-Draft Waived 12-02-2025 The Committee accepted the working draft of the panel & agreed they can be widely circulated for comments in the Technical Committee. -------
3 WC Draft 12-02-2025 Duration : 30 Days
Submitted for HOD approval
Remarks : Last date for sharing the comments is : 14 March 2025
-------
4 WC Draft 18-02-2025 WC approved by HOD
MEDC  MED 04, -------